Council archive · source document
Referenced Document MCU13/0171
sewerage treatment plant will be used to service the new factory effluent loads. Discussions with CSR, who previously handled operations at the brickworks, have concluded the existing factory amenities were serviced entirely by the existing treatment plant. There will be significant reduction in effluent flows to be handled by the same sewage treatment system when comparing with the brickworks factory. 9.0 ELECTRICAL AND TELECOMMUNICATION SERVICES Electrical services are supplied to the property via overhead power lines which enter the site near the brickworks sales & administration building at ‘Gate 1’. This supply will be used for the proposed Wimmers factory. There are existing Telstra lines in the near side road reserve of Lake MacDonald Drive and an existing Telstra Pit near ‘Gate 2’ entry. Telecommunications to the factory will be provided from here. 10.0 WATER SUPPLY Existing water reticulation supply is available in the Lake MacDonald road reserve along the site frontage. An existing service connection and fire hydrant are located in front of the existing staff offices (which are to be demolished). This water supply property connection will be used to service the factory. 11.0 CONCLUSION This report has been undertaken to assess the engineering requirements for this proposed Material Change of Use. It is our opinion that all engineering requirements can be successfully addressed during operational works and construction associated with renovating the factory. 1014-ENG-01_Version 1.0 (September 2013) Page 7 of 8 TS/cl
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT MCU13/0171Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.