Council archive · source document
Referenced Document MCU13/0171
12.0 LIMITATIONS and CLOSURE This report has been commissioned by Cooroy Property Pty Ltd and specifically investigates the subject site as described in this report. We consider that the study accurately reflects the engineering constraints and requirements for development of the subject site at the time the study was undertaken. If these conditions are known to change, the results of this study should be reviewed. This report is only to be used in full, and may not be used to support objectives other than those set out herein, except where written approval is provided by Barlow Shelley Consulting Engineers. Barlow Shelley Consulting Engineers accept no responsibility for the accuracy of information supplied to them by second and third parties. This report has been undertaken by a Registered Professional Engineer of Queensland generally in accordance with Sunshine Coast Regional Council’s Planning Scheme Codes and Policies and other industry standard guidelines. REVIEWED & APPROVED BY: _________________________________________ TONY SHELLEY – DIRECTOR (RPEQ 7736) BEng, ADCE, MIEAust, RPEQ For and on behalf of: BARLOW SHELLEY CONSULTING ENGINEERS AUTHORED BY: _________________________________________ CAMERON LANDRETH BEng (Hons) For and on behalf of: BARLOW SHELLEY CONSULTING ENGINEERS 1014-ENG-01_Version 1.0 (September 2013) Page 8 of 8 TS/cl
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT MCU13/0171Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.