Skip to the record
Accept no imitations.

Council archive · source document

Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335

Plans and drawings: the text below has words only, no drawings.

Very large file (10.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                          cave h•^a ^an•am^
                                                                                         Mains Cable Plan                                                       J DIET                    (A




                                                                                                                                                             c3001:00e8AII -12 12F/- SMOF
                                                                                                                                                             2ADIST                    (AA)
                                                                                                                                                                                                          F




                                                                                                                                                             c3001:DO.eaNl-12 12FI. 3MOF FNPEIU/STD (b)
                                                                                                                                                             4x0137                    (M)           P50


                                                                                                                                              C3001, DO-BBNI.12 12F1- SO FNPENYSTO (40)
                                                                                                                                              2x0IST
                                                                                                                                                                                   P50




                                                                                                                                                                                                          i




                                       For all Telstra DBYD plan enquiries -                                             Sequence Number: 22691630
      olstra                           email - [email protected]
                                       For urgent onsite contact only - ph 1800 653 935 (bus hrs)                        CAUTION: Fibre optic and/ or major network present
                    TELSTRA CORPORATION LIMITED A.C.N. 051 775 556                                                       in plot area. Please read the Duty of Care and
                                                                                                                         contact Telstra Plan Services should you require
                             Generated On 15/09/2011 15:28:58                                                            any assistance.


1WARNING - Due Is the naEua of Telstra underground plant and the age of some cables and records. It Is srposar'6le to ascertain the prods. location of all TNstra plant from Taleta•s plans. The accuracy and/or
 completorese of the information supplied can not be guaranteed as property boundaries, depths and other neutral landscape features may change over Ume, and accordingly the plena are Indecative only.
 Telsba does not warrant or hold out that Ile plans we accurate and aooepla no responsibility for any Inaccuracy shown on the plans.


 II is your responNbllty, to local. TNNre's underground plant by cardri hand pot-holing prior to any exoevelon In the vicinity end to exercise due care during that excavation.


 Please read and understand the Information supplied in the duty of care statement attached with the Telstra plans. TELSTRA WILL SEEK COMPENSATION FOR LOSS CAUSED BY DAMAGE TO ITS PLANT,

Tel.tn plans and Information suppled are vild for 00 days frorn the data of issue. If this limeframe has elapsed, please reapply for plans.

                                                                                                                                                                                                Page 2 of 2

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 3 - Construction Management Plan, Floor Plans.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.