Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335

Plans and drawings: the text below has words only, no drawings.

Very large file (10.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
            snsr+g.c                                                                                      DIAL BEFORE

            positive energy
                                                                                                         YOU DIG
                                                                                                         www.1100.rum.ou




                                       ENERGEX DBYD RESPONSE
                                     "ASSETS FOUND - INC FUTURE WORK"

   Our search has revealed there are existing and planned ENERGEX Underground Assets within the nominated
                     search area. They are shown on the attached plans. (See Notes 11 & 12.)

To:        Mr Guy Marttr.                                     DBYD Sequence No:           226911631
Company. CONTRAST                                             Date of Response: 19-Sep-2011
Address: UNIT 4 10 Hudson Rd                                  Period of Plan Validity: 28 Days
           Albion Old 4010

Email Address:                            Phone:                    Mobile:                       Fax:
  reception(@contrast.com.au               0738622366                 Not Supplied                 0738622944
Location of Search: 215A DAVID Low Way
                       Peregian Beach QLD 4573
UBD Map Ref. 29K 13

External Comments (if any):


It is Important that you note:

      1.  Please read and understand all the information and disclaimers provided - including the Terms and Conditions on
         the following pages.
    2. We have only searched that area which has been nominated. If this nominated area is not what you require,
         please resubmit another enquiry with DBYD
    3. Plans provided by ENERGEX are only an indication of the presence of Underground assets within the nominated
         locations provided are approximate and the plans are not suitable for scaling purposes as exact ground cover and
         alignments cannot be provided.
    4. Plans provided by ENERGEX do not show the presence of any Overhead Network.
    5. That in addition to underground cables marked on attached plan there maybe underground Earth Conductors or
         Consumers Mains in the vicinity of the nominated work area(s) that are not marked on the plans.
    6.    This advice does not identify the presence of private underground cables (inc. consumers' mains) that may run
         from ENERGEX mains onto private property. Assets located on private property are the responsibility of the
         owner for identification and location.
    7. Underground Cable Locators can be found in the Yellow Pages under Electronic Detectors, or Underground
         Service Locators on an Internet search.
    8. The ENERGEX Dial Before You Dig information provides the vicinity of underground cable and will not be
         adequate for conveyancing purposes. A Solicitor's Search can be arranged through ENERGEX.
    9. In the event that excavation does not commence within 28 days of receipt of a plan, a new plan should be
         obtained.
    10. For Cable Support advice around the 33Kv and 110Kv Underground Networks please note that you should allow
         for a minimum of twenty (20) working days advance notice in your construction program to permit ENERGEX time
         to allocate the necessary resources to carry out the investigations. Please contact the ENERGEX DBYD team on
         the details fisted below.
    11. We have provided a copy of the current revision for those works plans which illustrate the underground
         reticulation not shown on the DBYD plans.
    12. The dotted areas on the DBYD map will represent works plans areas where the future works are being
         completed. We cannot guarantee how far the construction has progressed or if the construction is built to the
         indicated plan.
    13. Immediately report life threatening emergencies to ENERGEX on 13 19 62




ENERGEX Limited - ABN 40 078 849 055                                                       24 Hour Loss of Supply 13 62 62
26 Reddacliff Street Newstead QLD 4006                                                      24 Hour Emergencies 13 19 62
GPO Box 1461 Brisbane Queensland 4001                                                           General Enquires 13 12 53
             Contact ENERGEX DBYD Monday to Friday from 7 am to 4 pm on (07) 3664 5400 or dbvdQeneroex.com.au
                                                     www.eneroex.com.au

               To resubmit or change the nominated search area contact DBYD via Phone 1100 or www.1100.com.su

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 3 - Construction Management Plan, Floor Plans.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.