Council archive · source document
Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (10.1 MB): may take a few minutes to open.
energex DIAL BEFORE
positive energy
YOU DIG
www.1100.com.ou
Dial Before You Dig Terms and Conditions
"Duty of Care" for Everyone
Responsibilities When Working In the Vicinity of ENERGEX Plant
Everyone has a legal "Duty of Care" that must be observed, particularly when working in the vicinity of electrical plant. Electrical plant
includes underground cables, conduits and other associated underground equipment. When discharging this "Duty of Care" in relation to
ENERGEX plant, the following points must be considered:
1. It is the responsibility of the architect, consulting engineer, developer, and head contractor in the project planning stages to design for
minimal impact and protection of ENERGEX plant. ENERGEX will provide free plans showing the presence of its underground plant
to assist at this design stage.
2. It is the constructor's responsibility to:
a) Anticipate and request plans of ENERGEX plant for a particular location at a reasonable time before construction begins.
b) Visually locate ENERGEX plant by hand digging where construction activities may damage or interfere with ENERGEX plant.
c) Contact ENERGEX's Network Customer Services (see above for details) if ENERGEX plant is wholly or partly affected by
planned construction activities.
3. As the alignment and boundaries of road ways with other properties (and roads within road ways) frequently change, the alignments
and boundaries contained within ENERGEX plans and maps will frequently differ from present alignments and boundaries on the
ground". Accordingly, In every case where it appears that alignments and boundaries have shifted, or new road ways have been
added, the constructor should obtain confirmation of the actual position of ENERGEX cables and pipelines under the road ways. In
no case should the constructor rely on statements of third parties in relation to the position of ENERGEX cables and pipelines.
Important Points To Note - Please Read
• Plans and or details provided by ENERGEX are current for one month from the date of dispatch and should be disposed of by
shredding or any other secure disposal method after use.
• ENERGEX will provide free plans if an ENERGEX plant location request is made to Freecall "1100" (Dial Before You Dig - DBYD) and
at least 2 business days notice is given. ENERGEX does not provide information on private underground installations.
• ENERGEX retains copyright in all plans and details provided in connection with your request.
• ENERGEX plans or other details are provided for the use of the applicant, its servants, or agents, and shall not be used for any
unauthorised purpose.
• ENERGEX plans are circuit diagrams or pipe indication diagrams only and indicate the presence of plant in the general vicinity of the
geographical area shown. Exact ground cover and alignments cannot be given with any certainty, as such levels can change over
time.
• On receipt of plans and before commencing excavation work or similar activities near ENERGEX's plant, carefully locate this plant
first to avoid damage.
• ENERGEX, its servants or agents shall not be liable for any loss or damage caused or occasioned by the use of plans and or details so
supplied to the applicant, its servants and agents, and the applicant agrees to indemnify ENERGEX against any claim or demand for
any such loss or damage.
• The constructor is responsible for all plant damages when works commence prior to obtaining ENERGEX plans, or failure to follow
agreed instructions.
• ENERGEX reserves all rights to recover compensation for loss or damage caused by interference or damage, including consequential
loss and damages to its cable network, or other property.
• All underground conduits are presumed to contain asbestos. Refer to "Code of Practice for the Management and Control of Asbestos in
Workplaces [NOHSC: 2018 (2005)]
ENERGEX Limited - ABN 40 078 849 055 24 Hour Loss of Supply 13 62 62
26 Reddacliff Street Newstead QLD 4006 24 Hour Emergencies 1319 62
GPO Box 1461 Brisbane Queensland 4001 General Enquires 13 12 53
Contact ENERGEX DBYD Monday to Friday from 7 am to 4 pm on (07) 3664 5400 or dbyd(ooenergex.com.au
www.energex.com.au
To resubmit or change the nominated search area contact DBYD via Phone 1100 or www.1100.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.