Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (10.1 MB): may take a few minutes to open.
'hill 'roil it oni iimmnnf ho %Ainrkinn nc»r ^AIIRir1Y nm*,g rlineko )
If the answer is "yes", you need to follow the three step process
a Planning e Contact ENERGEX
Exclusion zones The Electrical Safety Act 2002 requires you to contact ENERGEX if Application for Safety Advice
you are intending to undertake an activity where there is reasonable
If the work you and your staff are planning has the potential to likelihood an object being handled by persons, operating plant, Once you have contacted ENERGEX, a suitable date and time
encroach into powerline exclusion zones, you should contact machinery or vehicles can come into direct contact with or enter an will be arranged to meet and discuss working near overhead
ENERGEX for advice on doing the job safety. exclusion zone for an overhead powerline. exposed live parts.
Exclusion zone measurements depend on the voltage of the It is mandatory that you consult ENERGEX to ensure you will not Safety Advice consultation
powedine, type of work being performed and qualifications of people encroach these exclusion zones.
involved. If unsure, always seek safety advice from ENERGEX. Upon consultation with ENERGEX and the person responsible
Generally, workers and their equipment must maintain exclusion You can obtain a copy of the Code of Practice for "Working Near for the work site, ENERGEX may determine the safety control
zones around overhead powertines as follows: Exposed Live Parts" from the Queensland Government's Electrical measures to be implemented before any work is to commence.
Safety Office by calling 1300 650 662.
three metres for voltages up to 132kV (132,000 volt)
For a comprehensive guide to working near overhead powerlines, Issue of Safety Advice
six metres for voltages up to 330kV (330,000 volt)
visit the ENERGEX website energex.com.au. When control measures have been implemented. work may
eight metres for voltages over 330kV (330,000 volt)
To arrange a meeting with an ENERGEX representative contact commence as indicated on the Safety Advice on working near
Over 330kV 13 12 53 prior to commencement of your work, ENERGEX exposed live parts.
Up to 330kV Safety Advice relinquishment
Once the work has been completed, you must notify
Up to 132kV
ENERGEX immediately and return the signed Safety Advice
document to ENERGEX.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.