Council archive · source document
Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (10.1 MB): may take a few minutes to open.
Enquiry Confirmation PO Box 378
Abbotsford VIC 3067
Phone: 1100
Job No. 4943951
To: Mr Guy Martin Caller ID: 852211
Company: CONTRAST Phone: 0738622386
Address: UNIT 4 10 Hudson Rd Mobile: Not Supplied
Albion Old 4010 Fax No: 0738822944
Email: [email protected]
J
Dig Site Details
Warn m a: The map below only displays the location of the proposed dig site and does not display any asset owner's pipes or cables.
The area highlighted has been used only to identify the participating asset owners, who will send information to you directly.
Asset owners aim to provide you with details of their assets within 2 working days.
I Enquiry late: 15f09/2011 2:40:59 PM
Start Date: 20/09/2011
Address: 215A DAVID Low Way
Peregian Beach OLD 4573
Intersection Not Specified
0 • Check that the location of the dig site Is correct. If not you
MUST submit a new enquiry.
• Should the scope of works change, or plan validity dates
expire, you must submit a new enquiry.
• Do NOT dig without plans. Safe excavation Is your
responsibility. If you do not understand the plans or how
to proceed safety, please contact the relevant asset
owners.
Map Ref: UbdSun 29K13
Additional work site Information:
Visit our new Web she - www.1100.com.au (QLD)
Your Responsibilities and Duty of Care
• If plans are not received within 2 working days, contact the asset owners directly & quote their Sequence No.
• ALWAYS perform an onsite inspection for the presence of assets. Should you require an onsite location, contact the asset owners
directly. Please remember, plans do not detail the exact location of assets.
• Pothole to establish the exact location of all underground assets using a hand shovel, before using heavy machinery.
• Ensure you adhere to any State legislative requirements regarding Duty of Care and safe digging requirements.
• If you damage an underground asset you MUST advise the asset owner immediately.
• By using this service, you agree to the terms and disclaimers set out at www.1100.com.au.
• For more Information on safe excavation practices, visit www.1100.com.au
Asset Owner Details
The asset owners listed below have been requested to contact you with information about their asset locations within 2 working days.
Additional time should be allowed for information issued by post.
Seq No. Asset Owner Contact No Nottflation Status
22691632 Sunshine Coast Regional Council 0754758719 Notified
22691631 Energex, Electricity (Old) 0736645400 Notified
22691630 Telstra OLD, South East 1800653935 Notified
22691629 Unitywater North 0754200702 Not i fied
" Asset owners highlighted by asterisks •' require that you visit their offices to collect plans.
/ Asset owners highlighted with a hash require that you call them to discuss your enquiry or to obtain plans.
LODGE YOUR FREE ENQUIRY ONLINE - 24 HOURS A DAY. SEVEN DAYS A WEEK
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.