Council archive · source document
Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (10.1 MB): may take a few minutes to open.
F contrast
Sediment Control
Will be in accordance with the Simmonds and Bristow Sediment and Erosion Control plan
Parking
Refer attachment C for site parking area
A designated area will be set out for the purpose of on site parking for all construction staff.
Site Access & Roadwork's
Site access will be by Grebe Street which runs off the David Low Way. As part of the development approval
conditions Grebe Street is to be re surfaced.
As part of the proposed development the bus bay and footpath is to be re configured. Prior to any works
being undertaken all permits for lane closures and crossovers shall be obtained from the relevant authorities.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.