Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335

Plans and drawings: the text below has words only, no drawings.

Very large file (10.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
F contrast
  Sediment Control

      Will be in accordance with the Simmonds and Bristow Sediment and Erosion Control plan

  Parking

       Refer attachment C for site parking area

      A designated area will be set out for the purpose of on site parking for all construction staff.


  Site Access & Roadwork's
      Site access will be by Grebe Street which runs off the David Low Way. As part of the development approval
      conditions Grebe Street is to be re surfaced.

      As part of the proposed development the bus bay and footpath is to be re configured. Prior to any works
      being undertaken all permits for lane closures and crossovers shall be obtained from the relevant authorities.

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 3 - Construction Management Plan, Floor Plans.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.