F conrast
Project team contact numbers
Contact details are included in attachment B
Construction site layout
Refer to Attachment C for the site layout. The layout details the site office, storage/stockpile areas,
staff amenities, crane location (if applicable), and access/egress from the site.
A man proof fence with lockable gate will be placed on the boundaries of the property to avoid pedestrian
to get into the construction site.
Emergency contact numbers will be displayed on the main gate entrance.
Excavation
The following measures will be undertaken prior to any excavation taking place.
• Dial before you dig will be obtained to show what services are in the effected area.
• An Underground service locator will be commissioned to map all services in the excavation area.
• Specialist equipment (vacuum trucks etc) and or personnel will be used when excavating around
existing services.
Waste management
Waste avoidance is a priority on this project, followed by reuse of waste products, and then
recycling, with disposal of waste as a last resort.
The following control measures will be adopted to minimise and manage waste in the project:
• Wastes will be stored in a manner that does not pose harm to the environment.
• Skip bins will be provided to contain waste materials.
• Any contaminated soil will be classified and disposed to legally operating waste management
facility.
• Vehicles used for transportation will be securely covered to prevent waste spillage during
removal.
• Storage containers will be secured on vehicles.
• Only compatible wastes will be transported together.
• Recyclable waste will be taken to recycle centres.
• Waste will be disposed to licensed waste management centres
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.