Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335

Plans and drawings: the text below has words only, no drawings.

Very large file (10.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
F conrast
  Project team contact numbers
       Contact details are included in attachment B

  Construction site layout
       Refer to Attachment C for the site layout. The layout details the site office, storage/stockpile areas,
       staff amenities, crane location (if applicable), and access/egress from the site.

       A man proof fence with lockable gate will be placed on the boundaries of the property to avoid pedestrian
       to get into the construction site.

       Emergency contact numbers will be displayed on the main gate entrance.

  Excavation
       The following measures will be undertaken prior to any excavation taking place.

           •   Dial before you dig will be obtained to show what services are in the effected area.

           •   An Underground service locator will be commissioned to map all services in the excavation area.

           •   Specialist equipment (vacuum trucks etc) and or personnel will be used when excavating around
               existing services.



  Waste management
       Waste avoidance is a priority on this project, followed by reuse of waste products, and then
       recycling, with disposal of waste as a last resort.

       The following control measures will be adopted to minimise and manage waste in the project:


       •       Wastes will be stored in a manner that does not pose harm to the environment.

       •       Skip bins will be provided to contain waste materials.

       •       Any contaminated soil will be classified and disposed to legally operating waste management
               facility.

       •       Vehicles used for transportation will be securely covered to prevent waste spillage during
               removal.

       •       Storage containers will be secured on vehicles.

       •       Only compatible wastes will be transported together.

       •       Recyclable waste will be taken to recycle centres.

       •       Waste will be disposed to licensed waste management centres

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 3 - Construction Management Plan, Floor Plans.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.