Original source · versioned page text
2017-10-10 Planning & Environment Committee Agenda
The original of this document is very large (21.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 OCTOBER 2017
14. The use may operate 7 days a week from 10am to 12am (with the exception of New
Year’s Eve where it may operate until 2am). The outdoor dining area is not to be
utilised after 10pm.
Car Parking
15. The existing carparking area adjacent to the surf club building must be
upgraded. The works must be generally in accordance with drawing number 1006
Revision C prepared by Andrew Bock Architecture and undertaken in accordance
with an Operational Works approval and must include in particular:
a. detail to demonstrate that sufficient area is provided for delivery/service vehicle
movements including clearances;
b. materials and surface treatments to prioritise pedestrian movements and other
“shared” areas;
c. signage to designate pedestrian paths, shared areas and vehicle movement
areas;
d. bollard and seating design and other surface treatments in accordance with
Council’s “look and feel” (Council’s design principles and local colour palette);
e. detail to clearly indicate stormwater drainage paths;
f. a reconfiguration of the carparking access, aisles and spaces to improve
performance.
16. Car parking in Webb Road must be upgraded to provide 4 additional on street car
park spaces and include in particular provide:
a. filling, roadworks and drainage works;
b. linemarking;
c. dimensions and grades in accordance with AS/NZS2890.1:2006.
The proposed works are to be undertaken in accordance with an Operational Works
approval. The works must be generally in accordance with drawing number 16636-
SK01 Revision A prepared by TOD Noosa.
Paving Treatment of Vehicle Movement Areas
17. Alternative materials, surface patterns, or threshold treatments must be used to
articulate the pavement treatment of vehicle movement areas, shared areas and
pedestrian paths.
18. A Construction Management Plan for the development must be submitted to and
approved by Council at least 5 working days prior to the commencement of any
Building works or at least 5 working days prior to the pre-start meeting for Operational
Works. The Construction Management Plan shall include but not be limited to:
a. site working hours;
b. communication and consultation processes with surrounding premises;
c. control and suppression of –
(i) noise;
(ii) vibration;
(iii) dust;
(iv) odours and exhausts control; and
(v) site working hours.
d. employee and contractor induction and education processes.
19. A Traffic Management Plan for each separate construction phase of the development
must be submitted to and approved by Council at least 5 working days prior to the
commencement of any works or at least 5 working days prior to the pre-start meeting
for Operational Works. The Traffic Management Plan must include but not be limited
to:
Page 79 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.