PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 OCTOBER 2017
a. limiting the routes for the heavy vehicles to the major road network and define
the route to the site;
b. indicate provision for on-site and off-site parking and shuttle buses (if required)
for the required workforce;
c. indicate the location of loading and unloading areas;
d. indicate the location of any “holding” areas for heavy vehicles;
e. operating hours.
20. Construction staff must not park within the Council carparks in Belmore Terrace,
Duke Street, Webb Road or any other surrounding street. Parking must either be on
site or at a suitable off-site location serviced via a shuttle bus. Details must be
included in the Traffic Management Plans for the site.
Bicycle/Scooter Provision
21. Four bicycle racks (capable of accommodating 8 bikes) and 4 scooter spaces must
be provided on site at the rear of the building. The works must be undertaken in
accordance with an Operational Works approval and clearly shown on the plans for
carparking.
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. Connection of any new works on site and in the carparking area to the existing
stormwater drainage system;
b. The works in Webb Road must be generally in accordance with drawing
number 16636-SK01 Revision A prepared by TOD Noosa and include sufficient
detail:
i. To quantify the catchment and calculate runoff to the proposed inlet and
define overland flow component bypassing the inlet in a 1% AEP event
ii. To demonstrate improved inlet capture
iii. To demonstrate how the adjacent 1in 4 fill batter is to be stabilised to
avoid scour when flows bypass the proposed inlet
iv. To demonstrate that cars parked in the adjacent carparking spaces will
not be flooded in a 1% AEP event
Geotechnical Stability Add for REC: - Subdivisional Requirements
23. All works must be carried out in accordance with a Geotechnical Report (or part
thereof) prepared by a qualified person* and endorsed through an Operational Works
approval. *(Refer to Advisory Note)
24. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the Geotechnical Report
for the development and that the development has a minimum factor of safety against
landslip of 1.5 in the long term. *(Refer to advisory Note)
Earthworks and Retaining Walls
25. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
26. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Page 80 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.