PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 OCTOBER 2017
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Landscaping Works
28. The development site must be landscaped. The works must be undertaken in
accordance with Planning Scheme Policy 3 – Landscaping Plants and Guidelines for
that specific area and must include in particular the works shown on the Approved
Plans.
29. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
30. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Retention of Existing Trees and Vegetation
31. All trees and vegetation identified for retention must be protected in accordance with
AS 4970, Protection of trees on development sites.
32. A “no clearing zone” must be established and maintained over the existing vegetation
on the subject site. The following activities must not be carried out within the no
clearing zone:
a. clearing, cutting down, poisoning, lopping or pruning of native vegetation which
is indigenous to, or planted within, the zone
b. soil/spoil dumping and/or compacting
c. soil excavation, other than for planting indigenous native plants.
The following exceptions apply:
i. declared plants under the Land Protection (Pest and Stock Route Management)
Act 2002 and sub-ordinate Regulation 2003, and any Council Listed
Environmental Weeds, Exotic Grasses and other plants identified in writing by
Council
ii. indigenous native trees which pose a well-founded threat to persons or property
as approved in writing by Council
B. Find the following grounds are sufficient to justify the conflict with the Planning Scheme:
1. The proposed Entertainment & Dining business Type 1 Food & Beverage use is
associated with the Surf Club use.
2. The proposed development seeks to redevelop the existing surf club, will maintain
the same footprint and will result in a significantly improved facility for residents and
visitors to Sunshine Beach.
3. The proposal will result in improvements to existing on street car parking and
pedestrian access pathways in the area, improving access to car parking and safety
for pedestrians.
Page 81 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.