Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Development Application Part 1 of 2 - IDAS Form 1, Form 28, Checklist, vica versa doc details of attachment 13 Cooran Court Noosa Heads · OPW10/2100

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Handrail Installation

> The handrails will be shipped to you with 2 of our exterior

lug connectors on the end.

>» Place the lug connectors through the 2 overlapping tabs

on the float and tighten the large white plastic nut.

> Make sure the “R’ key (looks like a large cotter pin) is
inserted into the hole on the handrail base. This locks

the handrail in the white exterior lug connector.

>» Occasionally check to make sure that all the connectors

are tight.

The Aluminum Winch System can be mounted at the bow or
within a dock if extra rows are added.

 

>

Vv

11

INSTRUCTION MANUAL

 

5 foot handrail connected through the outside tabs with
exterior lug connectors

Winch Installation

The Winch is easily installed after the dock is assembled.
The winch ships assembled with winch, lines and blocks at-
tached and ready to install.

The Winch is commonly installed in the center row and at the
forward most bow location as shown on the left. It also can
be installed in a dock section if there is extra room at the bow.

The winch is installed using 2 white lug connectors with the
platform base resting on a SINGLE FULL FLOAT. Do not
install the winch on a Double Float—the double floats are not
designed to have the winch pressing on the top surface as
the expanse is too great.

If using the winch in a salt water environment, occasionally
rinse off the winch, line and blocks with fresh water. Also
check to make sure all bolts are tight and in good condition.

Every 6 months, lubricate the winch gears with a silicone lu-
bricant , such as WD-40.

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 1 of 2 - IDAS Form 1, Form 28, Checklist, vica versa doc details of attachment 13 Cooran Court Noosa Heads.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.