4 Sewerage Reticulation
4.1 Existing Infrastructure
A review of the DBYD data has revealed the location of existing sewerage reticulation within the Trading Post
Road and Prospect Place road reserves to the south of the subject site.
It is understood that an additional DN160mm PE sewerage main is located within an existing easement which
runs along the subject site’s eastern boundary. This sewer grades to the north and joins the existing
sewerage reticulation network to the east of the subject site.
The design documentation for the existing Palm Lake Resort stages is included within Appendix E with the
DBYD data included within Appendix D.
4.2 Proposed Demand
The demands on the existing sewer infrastructure were established using the methods described in SEQ
WS&S D&C Code. These demands were used to determine the consumption rates for the proposed
development. The sewer demand factors and flow parameters have been taken from Table 10 and Table
A17, respectively, to determine the consumption rates for the proposed development.
The results are presented in Table 4.1 below.
Table 4.1: Residential Sewerage Demands (Palm Lake Resort, Cooroy – Stage 6 Only)
Design Parameter Stage 3 Sewerage Values
Area of Land 0.5796 Hectare
Development Type Multiple Housing – Type 3 Retirement and Special Needs
ET 10
EP/ET Conversion factor 2.7
EP 27 EP
Average Dry Weather Flow (ADWF) 210 L/EP/Day
-1.05
C2 (C2= 4.7 x EP ) 3.33
ADWF 5.670kL/day or 0.066L/sec
PDWF (C2x ADWF) 18.853kL/day or 0.218L/sec
PWWF (5 x ADWF) 28.350kL/day or 0.328L/sec
Design Flow 0.328L/sec
Based on the above assessment it is envisaged that the proposed development will place a demand of
0.328L/sec during PWWF on the downstream sewerage network.
Engineering services layouts detailing the proposed sewerage infrastructure is included in Appendix C.
Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report Page 11 of 21
File Location: 171108_PEG0360_20 Trading Post Rd, Cooroy_ESR_R002.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.