Appendix D - Civil Engineering Report

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

5 Bulk Earthworks

5.1    Design Requirements

Earthworks for the site will be designed generally in accordance with the requirements of the Noosa Plan –
Planning Scheme Policy 5 – Engineering Design Standards: Roads, Drainage and Earthworks as appropriate
to the regulatory control and the Australian Standard for Earthworks for Commercial and Residential
Development (AS3798-2007).


5.2    General Site Earthworks

A soil assessment report will need to be prepared by a geotechnical engineer to provide a guide to the
treatment of the subject site prior to and during the earthworks construction and suitability for building
foundation construction. It is intended to accommodate any level differences with a series of maintainable
batters or retaining walls and therefore mitigating the disturbance to the natural topography.

It is also intended to utilise all of the suitable material won onsite and therefore is not envisaged to be any
spoil off site. The key variables associated with the site’s earthworks are the depth and distribution of the
existing materials and the strength and depth profile of the substrata material. It is advised that the soil report
for the site investigates these key items in depth to ensure that suitable soil treatments, accurate cost
estimation and building design can be facilitated.


5.3    Retaining Structures

Where retaining structures are required they will be designed such that the maximum height of this will be
limited to 1.5m and in accordance with the Noosa Plan and AS4678-2007. Retaining structures will not
encroach onto any adjoining property or road reserve.


5.4    Acid Sulphate Soils

A review of the NC Interactive Online Mapping System has determined that the subject site is located outside
of the mapped Acid Sulphate Soil zone.


5.5    Erosion and Sediment Management

Erosion protection measures will be incorporated during the construction phase with these measures being
designed and documented as a part of the detailed civil works for the site.

Ultimately, during the operational phase of the project, the sediment management will be through the use of
soft landscaping to ensure erosion is kept to a minimum.




Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report                                     Page 12 of 21
File Location: 171108_PEG0360_20 Trading Post Rd, Cooroy_ESR_R002.docx
Log in to download the original file

Appendix D - Civil Engineering Report.pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.