Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix D - Civil Engineering Report

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

6        Electrical and Telecommunications

A Dial Before You Dig (DBYD) investigation was undertaken to confirm the location of existing electrical and
telecommunications services within the vicinity of the subject site.

The DBYD investigation confirmed the location of underground telecommunications infrastructure, owned and
operated by Telstra, within the adjacent Trading Post Road reserve to the south of the subject site. Additional
telecommunications infrastructure is located within the adjacent stages of the Palm Lake Resort, Cooroy.

Similarly, underground powerlines, owned and operated by Energex, are located within the adjacent Trading
Post Road reserve to the south of the subject site. Additional powerlines are located within the adjacent
stages of the Palm Lake Resort, Cooroy.

It is envisaged that the proposed development will connect to the existing services within the adjacent road
reserves as outlined above.     The connections to the electrical and telecommunications networks will be
undertaken by specialist consultants during the detailed design phase of the project.

The DBYD data is included in Appendix D with the location of the existing telecommunications and electrical
infrastructure shown on the engineering services layout included in Appendix C.




Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report                                  Page 13 of 21
File Location: 171108_PEG0360_20 Trading Post Rd, Cooroy_ESR_R002.docx
Log in to download the original file

Appendix D - Civil Engineering Report.pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.