Skip to the record
The gold standard in government transparency.

Council archive · source document

001 ECM_24526009_v1_Planners Report - TPC 2486 · 51992.547.01

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Document Set ID: 24526009
Version: 1, Version Date: 09/02/2026


[OCR of page images]
Town Planning Department's Report 12/2/93 97

13.

14.

15.

C 16.

17.

18.

19.

20.

21.

Document Set ID: 24526009

The developer shall provide a metered water connection from the water supply
system to the proposed development, in accordance with Council's standards and
to the satisfaction of the Shire Engincer.

Roof and surface water is to be collected on site and is to be discharged through
a single underground drain line into existing drainage in Grant Street to the
satisfaction of the Shire Engineer. A Building Approval shall not be granted until
the Shire Engineer has approved of the drainage scheme.

Provision of approved refuse containers in accordance with the requirements of
the Refuse Management Regulations of 1983 for the storage and collection of
refuse to the satisfaction of Council's Environmental Health Officer.

Provision of an imperviously paved and drained area to accommodate all refuse
containers to the reasonable satisfaction of Council's Environmental Health
Officer. This area is to be aesthetically screened from any road frontage or
adjoining property boundary and is to be setback a distance of two (2) metres
from any road frontage. A suitable hosecock and hoses are to be located in the
vicinity of the refuse container area.

Any flat or unit intended to be let out for fee or reward is to be licensed annually
with Council's Health Department in accordance with the provisions of Chapter
43 of Council's By-Laws prior to such letting.

Submission of a cash bond or trading bank guarantee to the sum of $2000 to
secure performance of conditions, prior to the issue of Building Approval. The
cash bond or trading bank guarantee will be returned upon performance of the
conditions of approval.

The provisions of this approval are to be effected, prior to the commencement of
the approved use. Council reserves the right to call upon the bond or guaranteed
sum referred to in this approval for the purposes of litigation should the use not
be conducted in accordance with this approval.

The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of
the Local Government (Planning and Environment) Act if commencement of
erection or works have not been made in accordance with that Permit or the rights
conferred by that Permit are not exercised within two (2) years of the date of issue
of the Permit.

The Town Planning Consent Permit lapses where:—

a. __ the use or erection of a building or other structure associated with the use,
has not been commenced within four (4) years of the date of issue of the
Town Planning Consent Permit, unless application is made and approved
by Council for an extension; or

Version: 1, Version Date: 09/02/2026

 

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001 ECM_24526009_v1_Planners Report - TPC 2486.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.