Skip to the record
Beware of cheap imitations.

Council archive · source document

001 ECM_24526009_v1_Planners Report - TPC 2486 · 51992.547.01

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Document Set ID: 24526009
Version: 1, Version Date: 09/02/2026


[OCR of page images]
Town Planning Department's Report 12/2/93 96

10.

a.

12.

Document Set ID: 24526009

Existing trees on the site and within road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved
use. The landscape plans referred to above are to denote areas of existing
vegetation or existing trees proposed to be retained.

Construction work and other associated activities are permitted only during the
hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on
public holidays, except where extended hours are approved by the Building
Surveyor.

Any advertising sign or device is to comply with the provisions of Council's
policies on advertising.

Payment of contributions in accordance with Council's Policy on Water Supply
and Sewerage Headworks, current at the time of Building Approval. An estimate
only of the charges as at November 1992, under the current policy is as follows:-

Water Supply - $2257.86
Sewerage  - $1038.62

TOTAL: $3296.48

Please note that the headworks charges will alter in accordance with Price Index
variations or if any amendment is made to Council's policy.

If payment is not proposed to be made prior to the issue of Building Approval, a
cash bond or trading bank guarantee for the required amount is to be lodged, prior
to the release of that Approval. The contribution is then required to be made
within fourteen (14) days of the issue of Building Approval.

The footpath across the frontage of the site is to be upgraded by the provision of
a 1.2 metres wide concrete footpath and the forming, grassing and topsoiling of
the remaining area to the satisfaction of the Shire Engineer. The footpath is to be
generally located 0.9 metres from the property alignment and is to be integrated
with any existing slopes and vegetation within the road reserve.

The developer shall bear the cost of alteration of any public utility or other
facilities necessitated by the development of the land or associated construction
works external to the site.

Connection to Council's existing water supply and sewerage reticulation systems
at the developer's expense to the standards and requirements of the Shire
Engineer.

Version: 1, Version Date: 09/02/2026

 

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001 ECM_24526009_v1_Planners Report - TPC 2486.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.