Original source · versioned page text
2017-04-18 General Committee Agenda
The original of this document is very large (12.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 APRIL 2017
Attachment 2
Page 12 of 59
GENERAL COMMITTEE MEETING AGENDA 18 APRIL 2017
Attachment 2
Cooroy Memorial Hall Date: 12 April 2017
Building Maintenance/Upgrade Programme
Te Ch Expenditure($) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
po
ey eS ee
|_ +4 Sie earngtencing &scatoxing s20e00 | MY
ee ee ee ee
[+3 categiomatwotrepare s2s000
[+4 Baiting etrorrpnie 20cm
[+s suntoorrepa $1000
[+8 Ecematootrepeke stag
ee |
ae (
po
J zeenen upgrade
[24 Removensing somo
[22 Wietscaningretning sooo
[2 raeten contectinewt ses fT
J 2a Pumvenerc. smo PO
2s roning oP
a SS
ee SS
| subtotas ses PT
po
es
eS |
| alsctingrtning scm
| Pumeeeorc emo PO
| Penne som
re sD
J Becatraton om
| subtotas sez PP
po
| senyurgrades
Jenner, sro
] aot Srostonty S100
a ca
a (
po
a (Oe
pf
|_econingenciestoverneate sznano CC
| Toravexpenorrune _sseaouo | $4300] sanooo | setnn0 | sero | seco | se0.000
Including estimated:
In-kind support $154,000
Cash outlay $230,000 Prepared by Cooroy Memorial Hall Association Inc. April 2017
Page 12 of 59See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.