Original source · versioned page text
2017-04-18 General Committee Agenda
The original of this document is very large (12.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 APRIL 2017
Page 17 of 59
GENERAL COMMITTEE MEETING AGENDA 18 APRIL 2017
3.2 Your Say Noosa
Following the public meeting Council established a Cooroy Memorial Hall YourSayNoosa website to
allow discussion to continue in an online forum. The site included a range of background documents
and the information presented at the Public Meeting.
Between 28 November and 31 January there were 608 visits to the site, 196 of these visitors actively
engaged in the site and over 100 documents were downloaded. Of particular interest was the
Independent Building Inspections report.
A number of written comments were received on the community forum component of the Your Say
Noosa site.
These comments include
A community's history should be preserved as much as is possible and practicable. The hall’s
long history and long standing connection with large parts of the community going back
generations contributes to what gives our town a sense of pride and continuity to longstanding
families and a sense of continuity and stability to new families. Residents can be proud of their
town when they can point out to visitors its history.
| think many of the past users will return to the hall if the hire rates are reasonable. | remember
the swearing in of the councillors as a very memorable event, and the hall was perfect for the
occasion. Some events certainly do just feel right there.
If grants or other ways of paying for the repairs e.g. something like the restoration of the Tait
house, arent available, | would like to see the repairs paid for by a one off levy, or a small annual
levy for a specified number of years for people who cannot afford a larger one off amount.
Reason for this is that Cooroy residents and Cooroy’s outlying suburbs, (Lake Macdonald, Black
Mountain etc) have helped to maintain the other halls in the shire from general rates since the
council took them over.
The wonderful old hall will always be a 'beggar' if it relies solely upon local government handouts
and public support. Generous and caring local residents have thrown their weight behind efforts
to save the hall and that patronage, can only be applauded. However, the hall will continue to
deteriorate unless a viable and continuing commercial revenue stream can be developed to
ensure a secure future and a wholesale refurbishment of the facility to meet modern needs and
usages.
| am against having commercial enterprise at the front of the building. That would completely
change the character of the building.
| think the Hall would make a beautiful, romantic venue for weddings and other functions
3.3. Further Consultation
After the November public meeting, Council commenced a more focused round of consultation.
Officers extended an offer to community members to meet with Council representatives to discuss
ideas and concerns. This included a range of meeting formats from discussions with individuals to
small groups.
Page 3
Page 17 of 59See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.