Budget Review 3 - 2016/17
Summary of Submissions Received $13,939,394 $2,358,283 -($165,881) $13,773,513
Cia oe CO was ae eae ld Cost Centre/ |2016/17 Current |2016/17 Actuals |Proposed PE Capital / CAPEX PROGRAM CAPEX Renewal / ery Te mee ll a
ead Budget Ped eee) Operating eyes le Tel
i be zt remstele rs
CPOSO Gympie Terrace pipe rehabilitation 500057 $142,641 $3,630 -($139,011) $3,630 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka Project deleted. Consolidated with 2016/17 project
Budget to be reallocated at BR3 to related road works
CPO0S51 Re-lining of Ben Lexcen stormwater §00058 $13,327 $5,829 -($7,498) $5,829 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka Project deleted. Consolidated with 2016/17 project
Budget to be reallocated at BR3 to related roadworks
CP052 Whole of Shire CCTV Drainage program §00532 $20,773 $7,484 ($13,289) $7,484 Capital STORMWATER DRAINAGE Renewal Bryan O'Connor Consolidated with 2016/17 project
2015/2016
CP053 Cootharaba Kinmond Creek Road Sandy Ck §00620 $24,578 $35,426 $10,848 $35,426 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka Increase of budget to cover design costs. Reduce against 500674
Amco Renewal - design
CPO54 Cootharaba Kinmond Creek Road Eastern $00621 $26,117 $35,183 $9,066 $35,183 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka Increase of budget to cover design costs. Reduce against 500675
Branch Amco Renewal -
CP055 Cootharaba, Kinmond Creek Road Sandy 500674 $1,050,000 $14,186 -($1,030,000) $20,000 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka Capital Works Executive (CWE) proposes to hold over until 2017/18
Creek Culvert after tenders recalled.
CP056 Cootharaba, Kinmond Creek Road Eastern §00675 $1,050,000 $760 -($1,049,000) $1,000 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka Capital Works Executive (CWE) proposes to hold over until 2017/18
Branch Culvert after tenders recalled.
CP057 Noosaville, Thomas Street & Gympie Terrace 500676 $530,000 $29,076 $17,210 $547,210 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka GCE are preparing to issue precast drawings for review and
Culverts approval prior to casting units for project.
CPOS8 Tewantin Poinciana Ave Kerb & Channel $00742 $52,000 $0 -($52,000) $0 Capital STORMWATER DRAINAGE Renewal Ed Hamill This project deferred. To be considered with another project in
Renewal 2017/18.
cP072 Emergent Works - Lake Weyba Road NEW $0 $0 $366,100 $366,100 Capital STORMWATER DRAINAGE Renewal Briefing note discussed 20/02/17 CWE and approval for emergent
Noosaville stormwater works
CP080 Noosa Heads, Paul Street pipe rehab NEW $0 $0 $165,000 $165,000 Capital STORMWATER DRAINAGE Renewal Cameron Shields CWE recommended for emergent stormwater works
CP081 Noosaville, Lake Weyba Drive, culvert relining NEW $0 $0 $307,698 $307,698 Capital STORMWATER DRAINAGE Renewal Jaro Bauleka CWE recommended for emergent stormwater works
and replacement
CP082 Six Mile Creek Flood Study Upgrade §00171 $100,000 $18,020 $83,996 $183,996 Capital STORMWATER DRAINAGE Upgrade Adam Britton Revenue from grant to cover increase in expenditure budget
CP086 Six Mile Creek Flood Monitoring System 500748 $0 $13,118 $100,000 $100,000 Capital STORMWATER DRAINAGE Upgrade Bryan O'Connor Total project cost $276,000. $100k anticipated spend this year. 60%
grant funded.
CP086 Six Mile Creek Flood Monitoring System 500748 $0 -($49,680) -($49,680) -($49,680) Capital STORMWATER DRAINAGE Upgrade Bryan O'Connor Total funding to be received $165,600, 30% ($49,680) received in
this financial year, balance on completion of project.
CP087 Six Mile Creek Flood Study Upgrade §00717 $0 -($25,199) -($83,996) -($83,996) Capital STORMWATER DRAINAGE Upgrade Adam Britton Total funding to be received $83996 all to be received in this
financial year
CPOS9 Peregian Beach - precinct planning 500085 $29,150 $12,622 -($8,300) $20,850 Capital STREETSCAPE & ROAD Upgrade Adam Britton See Rufous St Civil Works above for delivery details.
CORRIDORS
CPO60 Pomona Master Plan 00704 $20,000 $0 -($20,000) $0 Capital STREETSCAPE & ROAD Upgrade Craig Eldridge Project deferred due to resourcing constraints
CORRIDORS
CP095 Noosa Heads Noosa Junction - Timber Assets §00744 $90,000 $10,824 ~($20,000) $70,000 Capital STREETSCAPE & ROAD Renewal Ed Hamill Works being undertaken internally. Expected savings
Renewal CORRIDORS
CP061 Whole of Shire Forward Planning & Design 500546 $564,774 $58,293 -($414,774) $150,000 Capital TRANSPORT Upgrade Craig Eldridge See details in forward designing sheet. Program at risk due to lack
Program - Construction INFRASTRUCTURE of resoucres.
MANAGEMENT
CP062 Road directional signage (incl Noosa Entrance 500548 $2,290 $10,213 $47,710 $50,000 Capital TRANSPORT Upgrade Jaro Bauleka Installation process to be referred to Council. Budget estimate
sign INFRASTRUCTURE reduced to $2K
MANAGEMENT
CP063 Noosa Transport Strategy 500552 $29,708 $30,220 $10,292 $40,000 Capital TRANSPORT Expansion Carl Billingham Additional funds required to complete transport strategy.
INFRASTRUCTURE
MANAGEMENT
CPO64 Tewantin, Hilton Terrace & Ernest Street 500679 $425,000 $7,900 -($225,000) $200,000 Capital TRANSPORT Renewal Jaro Bauleka Ongoing with the design due for completion August 2017. CCTV
Intersection INFRASTRUCTURE inspections completed.
MANAGEMENT
CPO65 Tewantin, Cooroy Noosa Road Improvements, 00680 $360,000 $954 $32,800 $392,800 Capital TRANSPORT Renewal Jaro Bauleka Depot to begin construction in May 2017 to align with Stage 3 and
Stage 4 INFRASTRUCTURE reseal program.
MANAGEMENT
CPO066 Tewantin, Poinciana Avenue & Moorindil Street 500705 $50,000 $406 -($10,000) $40,000 Capital TRANSPORT Upgrade Jaro Bauleka Released streetlighting design and construct tender via
Intersection INFRASTRUCTURE vendorpanel, closes 7/3/2017.
MANAGEMENT
CP067 Pomona, Station Road Car Parking and Safety 500706 $250,000 $2,776 -($75,000) $175,000 Capital TRANSPORT Upgrade Jaro Bauleka Procure the concrete works in the upcoming April holidays. Then
Improvements INFRASTRUCTURE complete the roadworks in the June/July holidays.
MANAGEMENT
CP068 Noosaville Landfill - Dosing & Monitoring 500112 $120,000 $15,390 -($20,000) $100,000 Capital WASTE Upgrade lan Florence Two components installed — waiting on quote for changes to dosing
Equipment system. RFQs are out.
CP069 Noosaville Landfill Gravity Sewer from Holding §00682 $25,000 $27,964 $2,964 $27,964 Capital WASTE Upgrade Robert Walsh Construction completed. Nearing completion of capitalisation
Tank at Clean
CP089 Cooroy-Belli Creek Road Landslip Repair 500605 $0 -($153,444) -($153,444) -($153,444) Capital SEALED ROADS NETWORK Renewal Cameron Shieids NDRRA funding received for repairs completed in 2015/16 financial
year
CP097 Cooroy Transfer Station Renewal of Hard Stand NEW $0 $0 $35,000 $35,000 Capital WASTE Renewal Wayne Schafer Hardstand renewal works being brought forward from 2017/18
for Stockpiling area
cP098 Noosaville Landfill - Dosing & Monitoring 500640 $120,000 $15,390 -($60,000) $60,000 Capital WASTE Upgrade Wayne Schafer Equipment costs lower than estimated
Equipment
Page 30 of 59See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.