2017-04-18 General Committee Agenda

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   18 APRIL 2017




                                   Page 29 of 59

Budget Review 3 - 2016/17
Summary  of Submissions Received                                             $13,939,394       $2,358,283       -($165,881)     $13,773,513
 ea           ler eee eae ae ee el)                       Cost Centre/  |2016/17 Current |2016/17 Actuals |Proposed        PL ae           for icles    CAPEX PROGRAM                  er ae                bere Ta MeliiC lag Pere
                                                            Project     PTT fle                           PTC              ees             Operating                                        yelled
                                                            a     A                                                        CREE    ee
CP083         Noosa Depot Workshop Electrical Replacement    500727              $6,847            $9,293          $2,446            $9,293 Capital     CORPORATE BUILDINGS                 Renewal       Allan Hazell         Actual costs exceeded budget
cP021         North Shore Beachfront Campground —            500612              $25,000          $22,166         ($2,834)          $22,166 Capital     HOLIDAY PARKS                        New          Narelle Reid         Project completed.
              Planning Consultancy
CP022         Noosa North Shore, Campground                  500661             $110,000          $6,608        -($60,000)          $50,000 Capital     HOLIDAY PARKS                      Renewal        Adam Britton         Town planners engaged to prepare MCU. Road closure plans
              Redevelopment, Detailed Design                                                                                                                                                                                   prepared and under review.
CP023         Noosaville, Noosa River Holiday Park Small     §00662             $530,000           $1,965       -($480,000)         $50,000 Capital     HOLIDAY PARKS                      Renewal        Dallas Bickley       Construction to occur in 2017/18
              Amenities Replacement
CP024         Noosaville, Noosa River Holiday Park Large     500663             $180,000           $3,062       -($180,000)              $0 Capital     HOLIDAY PARKS                      Renewal        Dallas Bickley       Refurbishment delayed pending small amenities replacement
              Amenities Refurbishment
CP025         Boreen Point Camp Ground Electrical Mains      500664              $27,500           $1,173          $15,011          $42,511 Capital     HOLIDAY PARKS                      Renewal        Michelle Stirling    Request for additional funds approved by Capital works Executive.
              Board Replacement                                                                                                                                                                                                Works scheduled to occur after BR3 approval
CP026         Boreen Point Camp Ground Main Amenities        500665              $27,500          $12,190        -($15,310)         $12,190 Capital     HOLIDAY PARKS                      Renewal        Michelle Stirling    Note subsequent Property advice that works not complete to
              Plumbing and Tapware                                                                                                                                                                                             required scope,
CP027         Boreen Point Campground Installation of 9      500699              $13,150              $0           $7,850           $21,000 Capital     HOLIDAY PARKS                     Expansion       Michelle Stirling    Request for additional funds approved by Capital Works Executive.
              Power Sites                                                                                                                                                                                                      Works scheduled to occur after BR3 approval
CP091         Whole of Shire, Meeting Room Projectors and    500689              $17,580           $7,007       -($10,572)           $7,008 Capital     IT MAJOR PROJECTS                  Renewal        Justin Thomas        Reallocate costs to operating due to capitalisation threshold
              Smart Television                                                                                                                                                                                                 (projector replacement)
CP028         Noosa Hinterland Priority Playground - Planning 500551            $49,178             $689        -($29,178)          $20,000 Capital     PARKS & PLAYGROUNDS               Expansion       Dallas Bickley       Consultation planning underway.
              & Design
CP030         Tewantin RSL Park Shade Structure Renewal      §00613              $24,781          $23,581         ($1,200)          $23,581 Capital     PARKS & PLAYGROUNDS                Renewal        Dallas Bickley       Project / handover completed
CP031         Pomona, Skate Park Shade Sail                  500667              $25,000          $19,909         -($5,091)         $19,909 Capital     PARKS & PLAYGROUNDS:               Renewal        Dallas Bickley       Post completion defects rectification in progress.
CP032         Sunshine Beach, Skate Park Refurbishment       §00668             $200,000           $3,529      ~($180,000)          $20,000 Capital     PARKS & PLAYGROUNDS                 Renewal       Dallas Bickley       Design and constuction plans / documentation completed ready for
                                                                                                                                                                                                                               tender. Tender documentation programmed to be sent out by the
                                                                                                                                                                                                                               February 2017
CP033         Noosaville, Munna Park Basketball Court        §00669             $40,000           $33,689         ($6,311)          $33,689 Capital     PARKS & PLAYGROUNDS                Renewal        Dallas Bickley       Project / Handover Completed
              Replacement
CP034         Noosaville, Wyuna Drive Playground Renewal     §00670             $85,000           $71,511       -($13,489)          $71,511 Capital     PARKS & PLAYGROUNDS                Renewal        Dallas Bickley       Project / handover completed
CP035         Eenie Creek Pathway Stage 1 Signage            500099               $6,103           $7,168          $31,065          $37,168 Capital     PATHWAYS & ENABLING                Upgrade        Scott Morgan         Additional funds required to acquire lighting to complete project
                                                                                                                                                        FACILITIES
CP036         Noosa Heads Park Road, Boardwalk Design        500526              $90,000         $130,879          $40,879         $130,879 Capital     PATHWAYS & ENABLING                Renewal        Adam Britton         Design complete. GHD document audit completed. Prototype
              and consultation                                                                                                                          FACILITIES                                                             reinspected and found to be preforming well.
CP037         Peregian Beach David Low Way Pathway Re-       $00628             $141,206          $4,740        -($77 206)          $64,000 Capital     PATHWAYS & ENABLING                Renewal        Daniel Wishaw        Depot cost estimate $30k, though funds for possible service
             alignment                                                                                                                                  FACILITIES                                                             relocation included in budget - reviewed by CWE 20/02/17
CP038         Noosa Heads, Park Road Boardwalk               500671           $1,027,000              $0       ~($527,000)         $500,000 Capital     PATHWAYS & ENABLING                 Renewal       Adam Britton         Out to tender with construction not expected to be complete before
             Construction                                                                                                                               FACILITIES                                                             30 June
CP039         Noosa Heads, Main Beach Boardwalk              500672             $200,000          $1,398        -($150,000)         $50,000 Capital     PATHWAYS & ENABLING                Renewal        Jaro Bauleka         Strategy for delivery of 2x sections of boardwalk by end of financial
             Construction                                                                                                                              FACILITIES                                                              year.
CP040         Noosaville, Sea Eagle Drive Pathway            500700              $10,000          $8,788           $2,000           $12,000 Capital     PATHWAYS & ENABLING                 Upgrade       Daniel Wishaw        Awaiting bollard delivery and install
             Construction                                                                                                                               FACILITIES
CP041         Cooran, James Street Pathways Construction     500701             $100,000         $32,730         ($67,000)          $33,000 Capital     PATHWAYS & ENABLING                Upgrade        Cameron Shields      Works expected to be completed during March
                                                                                                                                                        FACILITIES
CP042         Peregian Beach David Low Way Raised            §00739              $80,000              $0         -($80,000)              $0 Capital     PATHWAYS & ENABLING                 Upgrade       Adam Britton         To be done in conjunction with Rufous Street civil works
              Pedestrian Crossing                                                                                                                       FACILITIES
CP088         Noosa Heads, Park Road Boardwalk               500671                   $0              $0          ($8,002)         ($8,002) Capital     PATHWAYS & ENABLING                Renewal        Adam Britton         Contribution from Free Noosa Campaign towards memorial plaque
             Construction                                                                                                                               FACILITIES                                                             on Noosa Boardwalk
CP096         Botanic Gardens Pathway Replacement            500740             $129,075           $5,875          $30,000         $159,075 Capital     PATHWAYS & ENABLING                Renewal        Ed Hamill            Additional funds to allow all identified pathways to be renewed
                                                                                                                                                        FACILITIES
CP084         Business Distribution and Land Needs Project   §00203                   $0           $1,515           $1,515           $1,515 Capital     PLANNING SCHEME                      New          Rowena Skinner       Funds required to complete project
cP043         Noosaville, Lake Weyba Drive Bus Turnaround    §00702                   $0              $0         $200,000          $200,000 Capital     PUBLIC TRANSPORT                   Upgrade        Daniel Wishaw        Emergent works initiation brief submitted to PCG for additional
                                                                                                                                                        INFRASTRUCTURE                                                         funds to commence stormwater works and procurement.
CP044         Whole of Shire - pavement surveys              500054               $1,350              $0          ($1,350)               $0 Capital     SEALED ROADS NETWORK               Renewal        Bryan O'Connor       Projects rolled into 2016/17 project
CP045         Tewantin Cooroy Noosa Rd Stages 2-6 Design     §00206             $104,481          $20,955        ($83,525)          $20,955 Capital     SEALED ROADS NETWORK               Renewal        Jaro Bauleka         Revised design due to changed scope of works
              Only
CP046         Sunrise Beach - Ben Lexcen Drive Southern      500617             $179,321         $244,644          $65,323         $244,644 Capital     SEALED ROADS NETWORK                Renewal       Jaro Bauleka         BR3 required as this project has gone over budget. Concrete and
              end Road Corridor                                                                                                                                                                                                traffic costs variance.
CP047         Black Mountain Rd Landslip                     500619             $299,265          $34,228        $450,735          $750,000 Capital     SEALED ROADS NETWORK               Renewal        Jaro Bauleka         Meeting with internal works department has highlighted delivery by
                                                                                                                                                                                                                               staff rather than contractor. Detailed design from GHD is still on
                                                                                                                                                                                                                               schedule for early March 2017.
CP048         Noosaville - Mary Street footpath, roadworks & 500741              $74,400          $35,266       -($17,075)          $57,325 Capital     SEALED ROADS NETWORK                Upgrade       Ed Hamill            Project completed.
              drainage improvements
CP073         Whole of Shire Reseal & Rehabilitation         500530           $4,473,547       $1,199,469       $2,500,000       $6,973,547 Capital     SEALED ROADS NETWORK               Renewal        Allan Hull           Capital Works Exec. Have recommended bringing forward
              Program
CP049         Tewantin Noosa District Sports Complex -       §00545              $25,240          $11,873        -($2,418)          $22,822 Capital     SPORTS GROUNDS &                    Upgrade       Jaro Bauleka         Project capitilisation completed 6/2/2017,
              Internal roadway                                                                                                                          FACILITIES

                                                                                                                                                               Page 29 of 59
Log in to download the original file

2017-04-18 General Committee Agenda(PDF, 12MB).pdf · 12.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.