Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                              ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                               Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                     Project No: K4277

         Table 8:       Catchment A Post Development Peak Flow Rates
           Average Recurrence Interval      ARI          2              5          10            20            100
           Coefficient of Runoff             C          0.72           0.81       0.85          0.89           1.00
           Average Rainfall Intensity
                                             I          164            202         223           253           321
           (mm/h)
           Area of Catchment (ha)            A         0.357           0.357      0.357         0.357         0.357
                              3
           Peak Flow Rate (m /s)             Q         0.118           0.162      0.188         0.224         0.318


         Table 9:       Catchment B Post Development Peak Flow Rates

           Average Recurrence Interval      ARI          2              5          10            20            100
           Coefficient of Runoff             C          0.75           0.84       0.88          0.92           1.00
           Average Rainfall Intensity
                                             I          164            202         223           253           321
           (mm/h)
           Area of Catchment (ha)            A         0.118           0.118      0.118         0.118         0.118
                              3
           Peak Flow Rate (m /s)             Q         0.040           0.055      0.064         0.077         0.105


         Table 10:      Catchment C Post Development Flow Rates

           Average Recurrence Interval      ARI          2              5          10            20            100
           Coefficient of Runoff             C          0.60           0.67       0.70          0.74           0.84
           Average Rainfall Intensity
                                             I          164            202         223           253           321
           (mm/h)
           Area of Catchment (ha)            A         0.026           0.026      0.026         0.026         0.026
                              3
           Peak Flow Rate (m /s)             Q         0.007           0.010      0.011         0.013         0.019


3.4      External Catchments
         The subject site and the surrounding area were examined to determine if any external catchments
         will contribute to the subjected site. The size of external catchments has been determined based on
         ground contours, existing roads and existing stormwater infrastructure. An external catchment has
         been identified to the North of the subject site. The external catchment has been analysed to ensure
         drainage has been sufficiently sized to convey external flows.

         The rational method has been utilised to calculate the peak flow rates. The parameters adopted in the
         rational method have been selected to reflect the current use of the external catchment.

3.4.1 Catchment Definition
         One external catchment has been considered for analysis. External Catchment A has an area of 449
         m² and currently discharges stormwater along the northern boundary of the subject site.

         The external catchment is shown on the Odyssey Consulting Group, External Catchment Plan (Ref:
         K4277/P011/C) included as Appendix E.

3.4.2 Coefficient of Runoff
         The coefficient of runoff (Cy) was determined based on the fraction impervious (f i) method as
         specified in QUDM. A fraction impervious value of 0.10 has been adopted in accordance with QUDM,
         Table 4.5.1 Fraction impervious vs development category. The adopted fraction impervious value
                                                                                                                1
         reflects the potential fully developed future land use. Using a one hour, ten year rainfall intensity ( I10)
         of 72.3 mm/hr, a C10 value of 0.70 has been adopted for External Catchment A.




K4277-0002-D                                        14 February 2019                                        Page 6 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.