Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 3.3.2 Coefficient of Runoff The post development coefficient of runoff (C year) was determined based on the fraction impervious 1 (fi) method as specified in QUDM. Using a one hour, ten year rainfall intensity ( I10) of 72.3 mm/hr, the following coefficient of impervious (C10) values have been adopted for the post development scenario. Table 5: Post Development Catchment Impervious Properties 2 2 Catchment Impervious Area (m ) Catchment Area (m ) Fraction Impervious C10 A 2,709 3,573 0.76 0.85 B 1,042 1,181 0.88 0.88 C 0 260 0.00 0.70 With reference to QUDM Table 4.5.2, by applying the frequency factors for the standard storms of 2, 5, 10, 20, 50 and 100 years result in the following pre development coefficients of runoff as shown in Table 6. Table 6: Post Development Coefficients of Runoff Catchment 2 5 10 20 100 A 0.72 0.81 0.85 0.89 1.00 B 0.75 0.84 0.88 0.92 1.00 C 0.60 0.67 0.70 0.74 0.84 3.3.3 Time of Concentration Post development catchments A & B consist of paved areas and have therefore been assumed to have a standard time of concentration of five (5) minutes as per T.4.6.2 – Recommended standard inlet time. The time of concentration for Catchment C is indicated below in Table 7. Table 7: Catchment C Time of Concentration Time of concentration Catchment Catchment Catchment 2 Overland flow Concentrated flow Area (m ) Properties Total tc Friend’s Equation QUDM Figure 4.09 Horton’s (n) = 0.035 Light cover L=5m C 260 bushland / poor n/a 5 min Slope = 6% grass cover t = 4.5min 3.3.4 Design Flow Rates Design storm flow rates have been calculated for standard storms with an ARI of 2, 5, 10, 20, 50 and 100 years for the post development case using design rainfall intensities from the Bureau of Meteorology. The Rational Method (Q = 2.78 x 10-3 CIA) has been used to calculate the required design flow rates for the subject site. The calculated post development peak flows for Catchment A, B and C are presented in Table 8, 9 and 10 respectively. K4277-0002-D 14 February 2019 Page 5 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.