Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                              ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                               Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                     Project No: K4277

         This objective shall be achieved by detaining site runoff within a detention tank located within the
         development.

4.2      Hydraulic Model
         A calculation of the required detention volume to mitigate any increase in total site discharge rates
         has been made using the DRAINS software programme.

         DRAINS modelling has been adopted at the preliminary planning stage to ensure that the detention
         tank volume is estimated with a higher degree of confidence. As finished site levels and internal pipe
         levels are still approximate, this initial calculation is an estimate but is accurate enough to progress
         the design with confidence.

         The DRAINS model comprised of two post development Catchments. Catchment A flows shall be
         directed towards existing stormwater infrastructure located in Eumundi Noosa Road via a detention
         basin. Catchment B flows shall be directed towards existing stormwater infrastructure located in
         Walter Hay Drive.

         The 2, 10 and 100 year ARI storm events were analysed for all standard durations ranging from 10
         minutes to 180 minutes. It was determined that the 25 minute storm is the critical duration for the
         peak site discharge for both the pre development and post development scenarios. The combined
         peak discharge rates for the site calculated by the DRAINS model is shown below for both scenarios.

         Table 13:      Peak Discharge Rate for Site (m3/s)
                                                      Q2                   Q10                         Q100


                 Pre Development                    0.104                 0.169                       0.277


         Post Development (unmitigated)             0.165                 0.266                       0.429


         As the development will increase peak discharge rates from the site, onsite detention will be required
         to attenuate runoff to pre development levels.

4.3      Detention Volume
         The following detention storage parameters were found to achieve the target mitigated pre
         development flow rates:

         Table 14:      Detention Tank A Parameters
                                                                                               2
           Detention Basin Base Surface Area                                           100 m
                                                                                               2
           Detention Basin Top Surface Area                                            100 m
           Detention Tank Invert Level                                                 9.14 m
           Detention Tank Height (including 300mm freeboard)                           1.53 m
           Low Flow Outlet Pipe Diameter (at invert of detention
                                                                                      300 mm
           area)
           Low Flow Orifice Diameter                                                  245 mm
           Mid Flow Orifice Diameter (at 0.40 m above invert of
                                                                                      115 mm
           detention area)
           High Flow Spillway (at 0.92 m above invert of
                                                                                         1m
           detention area)
                                                                                               3
           Detention Volume                                                            133 m

         The 25 minute design storm was the critical storm event for determining the required volume within
         the tank. A comparison of the pre development, post development and mitigated flow rates based on
         the above arrangement is shown in Table 15 followed by the hydrograph in Figure 3 for the critical
         duration of the Q100 storm event.



K4277-0002-D                                          14 February 2019                                        Page 8 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.