Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 This objective shall be achieved by detaining site runoff within a detention tank located within the development. 4.2 Hydraulic Model A calculation of the required detention volume to mitigate any increase in total site discharge rates has been made using the DRAINS software programme. DRAINS modelling has been adopted at the preliminary planning stage to ensure that the detention tank volume is estimated with a higher degree of confidence. As finished site levels and internal pipe levels are still approximate, this initial calculation is an estimate but is accurate enough to progress the design with confidence. The DRAINS model comprised of two post development Catchments. Catchment A flows shall be directed towards existing stormwater infrastructure located in Eumundi Noosa Road via a detention basin. Catchment B flows shall be directed towards existing stormwater infrastructure located in Walter Hay Drive. The 2, 10 and 100 year ARI storm events were analysed for all standard durations ranging from 10 minutes to 180 minutes. It was determined that the 25 minute storm is the critical duration for the peak site discharge for both the pre development and post development scenarios. The combined peak discharge rates for the site calculated by the DRAINS model is shown below for both scenarios. Table 13: Peak Discharge Rate for Site (m3/s) Q2 Q10 Q100 Pre Development 0.104 0.169 0.277 Post Development (unmitigated) 0.165 0.266 0.429 As the development will increase peak discharge rates from the site, onsite detention will be required to attenuate runoff to pre development levels. 4.3 Detention Volume The following detention storage parameters were found to achieve the target mitigated pre development flow rates: Table 14: Detention Tank A Parameters 2 Detention Basin Base Surface Area 100 m 2 Detention Basin Top Surface Area 100 m Detention Tank Invert Level 9.14 m Detention Tank Height (including 300mm freeboard) 1.53 m Low Flow Outlet Pipe Diameter (at invert of detention 300 mm area) Low Flow Orifice Diameter 245 mm Mid Flow Orifice Diameter (at 0.40 m above invert of 115 mm detention area) High Flow Spillway (at 0.92 m above invert of 1m detention area) 3 Detention Volume 133 m The 25 minute design storm was the critical storm event for determining the required volume within the tank. A comparison of the pre development, post development and mitigated flow rates based on the above arrangement is shown in Table 15 followed by the hydrograph in Figure 3 for the critical duration of the Q100 storm event. K4277-0002-D 14 February 2019 Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.