Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B Table 15: Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B Average Recurrence Interval 2 10 100 3 DRAINS Pre Development Flow Rate m /s 0.104 0.169 0.277 DRAINS Post Development Flow Rate 3 m /s 0.165 0.266 0.429 Catchment A Q100 3 DRAINS Mitigated Development Flow Rate m /s 0.104 0.169 0.277 Figure 3: Mitigated Post Development Catchment Q100 Flow Rates Catchment A will be collected by a detention tank to mitigate flows to less than that of the pre development scenario and will discharge to a LPOD on Eumundi Noosa Road. With reference to Figure 3 the detention arrangement can be seen to effectively mitigate the post development flows in all storm events for the proposed site. 3 The hydraulic analysis using the DRAINS model has determined that a minimum of 133 m of storage is required for runoff attenuation and is to be provided in the form of a detention tank located within the open space area. Refer to Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/E) and Odyssey Consulting Group, Stormwater Detention and Bio retention Details (Ref: K4277/P010/D) included as Appendix F, for details of the tank arrangement, indicative location and preliminary stormwater layout. The final location onsite and construction levels will be determined at detailed design stage. A copy of the DRAINS model used in this report can be made available to Council upon request. 5.0 WATER QUALITY ASSESSMENT 5.1 Background The development of land has the potential to increase the pollutant loads within stormwater runoff and downstream watercourses. During the construction phase of the development disturbance to the vegetation on the site has the potential to significantly increase sediment loads entering downstream watercourses. The operational phase of the development will increase the density of residential land use potentially increasing the amount of sediments and nutrients washing from the site. K4277-0002-D 14 February 2019 Page 9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.