Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                             ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                              Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                    Project No: K4277

         Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B
         Table 15:      Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B
           Average Recurrence Interval                                    2                10               100
                                                       3
           DRAINS Pre Development Flow Rate          m /s               0.104            0.169              0.277
           DRAINS Post Development Flow Rate           3
                                                     m /s               0.165            0.266              0.429
           Catchment A Q100
                                                       3
           DRAINS Mitigated Development Flow Rate    m /s               0.104            0.169              0.277




         Figure 3:      Mitigated Post Development Catchment Q100 Flow Rates

         Catchment A will be collected by a detention tank to mitigate flows to less than that of the pre
         development scenario and will discharge to a LPOD on Eumundi Noosa Road. With reference to Figure
         3 the detention arrangement can be seen to effectively mitigate the post development flows in all
         storm events for the proposed site.
                                                                                                        3
         The hydraulic analysis using the DRAINS model has determined that a minimum of 133 m of storage
         is required for runoff attenuation and is to be provided in the form of a detention tank located within
         the open space area. Refer to Odyssey Consulting Group, Stormwater Management Plan (Ref:
         K4277/P007/E) and Odyssey Consulting Group, Stormwater Detention and Bio retention Details (Ref:
         K4277/P010/D) included as Appendix F, for details of the tank arrangement, indicative location and
         preliminary stormwater layout. The final location onsite and construction levels will be determined at
         detailed design stage.

         A copy of the DRAINS model used in this report can be made available to Council upon request.



5.0 WATER QUALITY ASSESSMENT
5.1      Background
         The development of land has the potential to increase the pollutant loads within stormwater runoff
         and downstream watercourses.

         During the construction phase of the development disturbance to the vegetation on the site has the
         potential to significantly increase sediment loads entering downstream watercourses. The operational
         phase of the development will increase the density of residential land use potentially increasing the
         amount of sediments and nutrients washing from the site.




K4277-0002-D                                        14 February 2019                                        Page 9 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.