Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 6.0 OPERATIONAL PHASE MAINTENANCE REQUIREMENTS The proposed stormwater management devices will require maintenance and monitoring to ensure that they function as designed. The following section provides an outline of the necessary maintenance tasks for the proposed devices. 6.1 Bio-retention Basin Maintenance The most intensive period of maintenance is during the plant establishment period (first two years) when weed removal and replanting may be required. It is also the time when large loads of sediments could impact on plant growth particularly in developing catchments with poor building controls. Maintenance is primarily concerned with: Maintenance of flow to and through the bio-retention basin; Maintaining vegetation; Preventing undesired overgrowth vegetation from taking over the bio-retention basin; Removal of accumulated sediments; and Litter and debris removal. Vegetation maintenance will include: Fertilising plants; Removal of noxious plants or weeds; and Re-establishment of plants that die. Sediments accumulated at the inlets need to be monitored. Depending on the catchment activities the deposition of sediment can tend to smother plants and reduce the ponding volume available. Should excessive sediment build-up it will impact on the plant health and require removal before it reduces the infiltration rate of the filter media. The proposed SQIDs will require regular maintenance and monitoring to ensure that they function as designed. K4277-0002-D 14 February 2019 Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.