Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                          ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                           Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                 Project No: K4277


6.0 OPERATIONAL PHASE MAINTENANCE REQUIREMENTS
         The proposed stormwater management devices will require maintenance and monitoring to ensure
         that they function as designed. The following section provides an outline of the necessary
         maintenance tasks for the proposed devices.

6.1      Bio-retention Basin Maintenance
         The most intensive period of maintenance is during the plant establishment period (first two years)
         when weed removal and replanting may be required. It is also the time when large loads of
         sediments could impact on plant growth particularly in developing catchments with poor building
         controls.

         Maintenance is primarily concerned with:
              Maintenance of flow to and through the bio-retention basin;
              Maintaining vegetation;
              Preventing undesired overgrowth vegetation from taking over the bio-retention basin;
              Removal of accumulated sediments; and
              Litter and debris removal.

         Vegetation maintenance will include:
              Fertilising plants;
              Removal of noxious plants or weeds; and
              Re-establishment of plants that die.

         Sediments accumulated at the inlets need to be monitored. Depending on the catchment activities
         the deposition of sediment can tend to smother plants and reduce the ponding volume available.
         Should excessive sediment build-up it will impact on the plant health and require removal before it
         reduces the infiltration rate of the filter media. The proposed SQIDs will require regular maintenance
         and monitoring to ensure that they function as designed.




K4277-0002-D                                     14 February 2019                                      Page 14 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.