Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Table 19: Bio-retention Basin Maintenance Schedule Bio-retention Basin Maintenance Checklist Inspection Frequency: 3 Monthly Date of Visit: Location: Description: Site Visibility: Action Required Inspection Items Yes No (Details) Sediment accumulation at inflow points? Litter basin? Erosion at inlet or other key structures (e.g. crossovers)? Traffic damage present? Evidence of dumping (Building waste, oils etc)? Vegetation condition satisfactory (density, weeds etc)? Replanting required? Mowing required? Clogging of drainage points (sediment or debris)? Evidence of ponding? Damage/vandalism to structures present? Surface clogging visible? Drainage system inspected? Resettling of system required? Comments: 6.2 Permeable Pavement Maintenance Sediment accumulated over the permeable pavement needs to be monitored to ensure the permeability of the pavement is not reduced. The proposed SQIDs will require regular maintenance and monitoring to ensure that they function as designed. Maintenance is primarily concerned with: Maintenance of flow to and across the permeable pavement; Preventing undesired overgrowth vegetation; Removal of accumulated sediments; and Litter and debris removal. Maintenance will include: Pressure wash permeable pavers every 12 months. K4277-0002-D 14 February 2019 Page 15 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.