Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                       ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                        Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                              Project No: K4277


7.0 CONCLUSIONS
         Odyssey Consulting Group has been commissioned by Good Shepherd Lutheran College to prepare a
         Conceptual Stormwater Management Plan (CSWMP) for the Proposed Carpark at 115 Eumundi Noosa
         Road, Noosaville.

         This CSWMP details the conceptual planning, layout and design of the stormwater management
         infrastructure for both the construction and operational phases of this development.

         Hydraulic analysis demonstrated that the development will result in an increase in peak runoff as
                                                                                             3
         compared with the pre development scenario. An open-air detention basin with 133 m of volume is
         proposed to mitigate the increase in flows from the development.
                                                           2       2                          2
         A combination of two bio retention basins, 20 m and 4m respectively and 219m of permeable
         pavement is proposed for the operational phase of the development to treat stormwater runoff. A
         sediment and erosion control plan has been provided for the construction phase of the development
         and shall be implemented by the contractor and developer.




K4277-0002-D                                   14 February 2019                                     Page 16 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.