Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                                                                        ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                                                                         Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                                                               Project No: K4277


TABLE OF CONTENTS
1.0     INTRODUCTION .................................................................................................................................................. 1
         1.1     Background ................................................................................................................................................ 1
         1.2     Scope .......................................................................................................................................................... 1
2.0     DESCRIPTION OF SUBJECT SITE ........................................................................................................................... 2
         2.1     Location...................................................................................................................................................... 2
                 2.1.1       Site Topography.......................................................................................................................... 2
                 2.1.2       Vegetation and Land Use ........................................................................................................... 2
         2.2     Proposed Development.............................................................................................................................. 3
3.0     SITE HYDROLOGY AND HYDRAULICS ................................................................................................................... 3
         3.1     Background ................................................................................................................................................ 3
         3.2     Predevelopment ......................................................................................................................................... 3
                 3.2.1       Catchment Definition and Lawful Point of Discharge ................................................................. 3
                 3.2.2       Coefficient of Runoff ................................................................................................................... 3
                 3.2.3       Time of Concentration ................................................................................................................ 4
                 3.2.4       Design Flow Rates ...................................................................................................................... 4
         3.3     Post Development ...................................................................................................................................... 4
                 3.3.1       Catchment Definition and Lawful Point of Discharge ................................................................. 4
                 3.3.2       Coefficient of Runoff ................................................................................................................... 5
                 3.3.3       Time of Concentration ................................................................................................................ 5
                 3.3.4       Design Flow Rates ...................................................................................................................... 5
         3.4     External Catchments .................................................................................................................................. 6
                 3.4.1       Catchment Definition.................................................................................................................. 6
                 3.4.2       Coefficient of Runoff ................................................................................................................... 6
                 3.4.3       Time of Concentration ................................................................................................................ 7
                 3.4.4       Design Flow Rates ...................................................................................................................... 7
                 3.4.5       External Catchment Channel Conveyance .................................................................................. 7
4.0     STORMWATER DETENTION ................................................................................................................................. 7
         4.1     Objective .................................................................................................................................................... 7
         4.2     Hydraulic Model ......................................................................................................................................... 8
         4.3     Detention Volume ...................................................................................................................................... 8
5.0     WATER QUALITY ASSESSMENT ........................................................................................................................... 9
         5.1     Background ................................................................................................................................................ 9
         5.2     Water Quality Objectives ......................................................................................................................... 10
         5.3     Construction Phase .................................................................................................................................. 10
                 5.3.1       Common Pollutants .................................................................................................................. 10
                 5.3.2       Performance Criteria ................................................................................................................ 10
                 5.3.3       Sediment and Erosion Controls ................................................................................................. 11
                 5.3.4       Water Quality Monitoring and Inspections .............................................................................. 11
                 5.3.5       Reporting .................................................................................................................................. 12
         5.4     Operational Phase .................................................................................................................................... 12
                 5.4.1       Stormwater Quality Improvement Devices ............................................................................... 12
                 5.4.2       Design Parameters of the Stormwater Quality Improvement System ...................................... 13
                 5.4.3       Post Development Modelling Results - Mitigated .................................................................... 13
6.0     OPERATIONAL PHASE MAINTENANCE REQUIREMENTS ......................................................................................14
         6.1     Bio-retention Basin Maintenance ............................................................................................................ 14
         6.2     Permeable Pavement Maintenance ......................................................................................................... 15
7.0     CONCLUSIONS ...................................................................................................................................................16




K4277-0002-D                                                               14 February 2019                                                                         Page ii of iii
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.