Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 FIGURES Figure 1: Subject Site - Locality Plan (modified from maps.google.com.au) ................................................................. 2 Figure 2: Aerial Photograph (modified from google maps.google.com.au) .................................................................. 3 Figure 3: Mitigated Post Development Catchment Q100 Flow Rates............................................................................. 9 Figure 4: Music Modelling Treatment Train ............................................................................................................... 12 TABLES Table 1: Site Description .............................................................................................................................................. 1 Table 2: Pre Development Coefficients of Runoff ....................................................................................................... 4 Table 3: Pre Development Time of Concentration ...................................................................................................... 4 Table 4: Catchment A - Pre Development Internal Catchment Peak Flow Rates ........................................................ 4 Table 5: Post Development Catchment Impervious Properties .................................................................................. 5 Table 6: Post Development Coefficients of Runoff ...................................................................................................... 5 Table 7: Catchment C Time of Concentration.............................................................................................................. 5 Table 8: Catchment A Post Development Peak Flow Rates ......................................................................................... 6 Table 9: Catchment B Post Development Peak Flow Rates ......................................................................................... 6 Table 10: Catchment C Post Development Flow Rates.................................................................................................. 6 Table 11: External Catchment C .................................................................................................................................... 7 Table 12: External Catchment A Peak Flow Rates ......................................................................................................... 7 Table 13: Peak Discharge Rate for Site (m3/s) .............................................................................................................. 8 Table 14: Detention Tank A Parameters ........................................................................................................................ 8 Table 15: Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B .............. 9 Table 16: Construction Phase Key Pollutants .............................................................................................................. 10 Table 17: Construction Phase Water Quality Performance Criteria ............................................................................ 10 Table 18: Treatment Train Effectiveness of Proposed SQID ........................................................................................ 13 Table 19: Bio-retention Basin Maintenance Schedule................................................................................................. 15 APPENDICES Appendix A Skyline Surveyors, Contour and Detail Survey (Ref: 21 April 2017) Appendix B Burling Brown Architects, Site Plan (Ref: GSL06/SK02/P4) Burling Brown Architects, Carpark 1 (Ref: GSL06/SK03/P5) Burling Brown Architects, Carpark 2 (Ref: GSL06/SK04/P4) Appendix C Odyssey Consulting Group, Pre Development Catchment Plan (Ref: K4277/P005/B) Appendix D Odyssey Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/D) Appendix E Odyssey Consulting Group, External Catchment Plan (Ref: K4277/P011/C) Appendix F Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/E) Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/D) Appendix G Odyssey Consulting Group, Sediment and Erosion Control Plan (Ref: K4277/P008/C) Odyssey Consulting Group, Sediment and Erosion Control Details (Ref: K4277/P009/A) K4277-0002-D 14 February 2019 Page iii of iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.