Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                                                                      ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                                                                       Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                                                             Project No: K4277


FIGURES
Figure 1:        Subject Site - Locality Plan (modified from maps.google.com.au) ................................................................. 2
Figure 2:        Aerial Photograph (modified from google maps.google.com.au) .................................................................. 3
Figure 3:        Mitigated Post Development Catchment Q100 Flow Rates............................................................................. 9
Figure 4:        Music Modelling Treatment Train ............................................................................................................... 12



TABLES
Table 1:         Site Description .............................................................................................................................................. 1
Table 2:         Pre Development Coefficients of Runoff ....................................................................................................... 4
Table 3:         Pre Development Time of Concentration ...................................................................................................... 4
Table 4:         Catchment A - Pre Development Internal Catchment Peak Flow Rates ........................................................ 4
Table 5:         Post Development Catchment Impervious Properties .................................................................................. 5
Table 6:         Post Development Coefficients of Runoff ...................................................................................................... 5
Table 7:         Catchment C Time of Concentration.............................................................................................................. 5
Table 8:         Catchment A Post Development Peak Flow Rates ......................................................................................... 6
Table 9:         Catchment B Post Development Peak Flow Rates ......................................................................................... 6
Table 10:        Catchment C Post Development Flow Rates.................................................................................................. 6
Table 11:        External Catchment C .................................................................................................................................... 7
Table 12:        External Catchment A Peak Flow Rates ......................................................................................................... 7
Table 13:        Peak Discharge Rate for Site (m3/s) .............................................................................................................. 8
Table 14:        Detention Tank A Parameters ........................................................................................................................ 8
Table 15:        Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B .............. 9
Table 16:        Construction Phase Key Pollutants .............................................................................................................. 10
Table 17:        Construction Phase Water Quality Performance Criteria ............................................................................ 10
Table 18:        Treatment Train Effectiveness of Proposed SQID ........................................................................................ 13
Table 19:        Bio-retention Basin Maintenance Schedule................................................................................................. 15



APPENDICES
Appendix A       Skyline Surveyors, Contour and Detail Survey (Ref: 21 April 2017)
Appendix B       Burling Brown Architects, Site Plan (Ref: GSL06/SK02/P4)
                 Burling Brown Architects, Carpark 1 (Ref: GSL06/SK03/P5)
                 Burling Brown Architects, Carpark 2 (Ref: GSL06/SK04/P4)
Appendix C       Odyssey Consulting Group, Pre Development Catchment Plan (Ref: K4277/P005/B)
Appendix D       Odyssey Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/D)
Appendix E       Odyssey Consulting Group, External Catchment Plan (Ref: K4277/P011/C)
Appendix F       Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/E)
                 Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/D)
Appendix G       Odyssey Consulting Group, Sediment and Erosion Control Plan (Ref: K4277/P008/C)
                 Odyssey Consulting Group, Sediment and Erosion Control Details (Ref: K4277/P009/A)




K4277-0002-D                                                            14 February 2019                                                                          Page iii of iii
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.