Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 1.0 INTRODUCTION 1.1 Background Odyssey Consulting Group (ODC) has been commissioned by Good Shepherd Lutheran College to prepare a Conceptual Stormwater Management Plan (CSWMP) for the Proposed Car Park at 115 Eumundi Noosa Road, Noosaville. 2 The subject site is described in Table 1 and has a total area of 5,014 m . Table 1: Site Description Developer Lot and Property Description Street Address 115 Eumundi Noosa Road, Good Shepherd Lutheran College Lot 30 on SP170751 Noosaville In preparing the CSWMP ODC has considered the applicable requirements for the management of the stormwater quantity measures appropriate for the subject site and proposed development. 1.2 Scope This CSWMP details the conceptual planning, layout and design of the stormwater management infrastructure for both the construction and operational phases of this development. This CSWMP aims to: Establish the required performance criteria for the proposed stormwater quantity and quality management systems; Provide a conceptual design of stormwater infrastructure including stormwater quantity and quality management controls where required; Provide guidelines for stormwater quality during construction and operational phase; Ensure stormwater runoff is conveyed through the site to a lawful point of discharge in accordance with QUDM and Council’s Planning Scheme Policy; and Provide reporting and monitoring mechanisms whereby the performance of this system can be measured enabling identification of corrective actions/alterations required to ensure the above mentioned objectives are maintained. This CSWMP has been prepared in accordance with the Queensland Urban Drainage Manual (QUDM) and Noosa Shire Council, Noosa Plan 2006. K4277-0002-D 14 February 2019 Page 1 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.