Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Subject Site Figure 2: Aerial Photograph (modified from google maps.google.com.au) 2.2 Proposed Development The proposed development involves construction of a sealed carpark. Refer to the attached plans Burling Brown Architects, Site Plan (Ref: GSL06/SK02/P4), Carpark 1 (Ref: GSL06/SK03/P5) and Carpark 2 (Ref: GSL06/SK04/P4) in Appendix B. 3.0 SITE HYDROLOGY AND HYDRAULICS 3.1 Background The following sections define the parameters of the sites hydraulics. The Rational Method has been applied to define flow rates at and through the subject site. 3.2 Predevelopment 3.2.1 Catchment Definition and Lawful Point of Discharge The pre development scenario consists of an internal and small external catchment and small external catchment that conveys the stormwater to the south and west boundaries of the site where it discharges to the nature strip and into existing roadside kerb and channel along Eumundi Noosa Road and Walter Hay Drive, which represents the sites Lawful Point of Discharge (LPOD). The pre development catchments and LPOD are shown on ODC, Pre Development Catchment Plan (Ref: K4277/P005/B) in Appendix C. 3.2.2 Coefficient of Runoff A coefficient of runoff (Cy) was calculated for the site in accordance with the fraction impervious method from QUDM. A fraction impervious value of 0.00 was applied. With a 1 hour 10 year rainfall of 72.3 mm/hr and with reference to QUDM Table 4.5.3(a) the C10 coefficients of runoff was determined to be 0.70. With reference to QUDM Table 4.5.2, by applying the frequency factors for the standard storms of 2, 5, 10, 20, 50 and 100 years result in the following pre development coefficients of runoff as shown in Table 2. K4277-0002-D 14 February 2019 Page 3 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.