Stormwater Management Plan

Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GOOD SHEPHERD LUTHERAN COLLEGE                                                                     ODYSSEY CONSULTING GROUP
Lot 30 on SP170751                                                                      Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                            Project No: K4277

         Table 2:       Pre Development Coefficients of Runoff

           Catchment               2               5                      10                     20                100

                A                 0.60           0.67                     0.70                  0.74               0.84


3.2.3 Time of Concentration
         To calculate the time of concentration for the internal catchment the Friends Equation (tc =
                0.333  0.2
         (107nL )/S ) from QUDM has been applied for overland sheet flow with the remaining distance
         calculated as concentrated flow. Please refer to Table 3 for the calculated time of concentration.

         Table 3:       Pre Development Time of Concentration

                                                                                    Time of concentration

                           Catchment        Catchment                                   Concentrated
           Catchment               2                              Overland flow             flow
                            Area (m )       Properties                                                           Total tc
                                                                Friend’s Equation       QUDM Figure
                                                                                           4.09

                                               Open               Horton’s (n) =
                                           Space/parks –               0.045
               A              5,014         Light cover              L = 90 m                  n/a              12.50 min
                                          bushland / poor         Slope = 4.38%
                                            grass cover            t = 12.5 min


3.2.4 Design Flow Rates
         Design storm flow rates have been calculated for standard storms with an ARI of 2, 5, 10, 20, 50 and
         100 years for the pre development case using design rainfall intensities from the Bureau of
         Meteorology Rainfall IFD Data System. The Rational Method (Q = 2.78 x 10-3 CIA) has been used to
         calculate the required design flow rates for the subject site. The calculated pre development peak
         flows for the subject site are presented in Table 4.

         Table 4:       Catchment A - Pre Development Internal Catchment Peak Flow Rates
           Average Recurrence
                                           ARI              2               5             10            20             100
           Interval
           Coefficient of Runoff             C             0.60            0.67          0.70           0.74           0.84
           Average Rainfall Intensity
                                             I           114.91           142.10        157.53         178.98        228.29
           (mm/h)
           Area of Catchment (ha)           A             0.501           0.501          0.501         0.501          0.501
                              3
           Peak Flow Rate (m /s)            Q             0.095           0.132          0.154         0.183          0.267


3.3      Post Development

3.3.1 Catchment Definition and Lawful Point of Discharge
         The post development scenario consists of three internal catchments that convey the stormwater to
         the south and west of the site. Catchment A will discharge into existing Council stormwater
         infrastructure on Eumundi Noosa Road on the western site boundary. Catchment B will discharge into
         existing Council stormwater infrastructure on Walter Hay Drive on the southern corner of the site.
         Catchment C will remain mostly unchanged due to the existing vegetation and will continue to
         discharge to Council stormwater infrastructure on Walter Hay Drive. These discharge points represent
         the Lawful Points of Discharge (LPOD) for the site.

         The post development catchment areas and lawful points of discharge are shown on the Odyssey
         Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/D) included as Appendix D.




K4277-0002-D                                           14 February 2019                                             Page 4 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.