Skip to the record
Accept no substitutions.

Original source · versioned page text

FINAL Response to Information Request_ 03.05.2016

Attached to the e-mail MCU15/0109 - Response to Information Request - Email 1 of 6.msg.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

are typically associated with basement driveway access. The proposed landscaping of the site will limit any visual
impacts of the proposal.


Issue – External Finishes

The submitted planning report indicates the development will be finished in environmental hues to assist its
visual integration with the natural setting. An indicative architectural rendering, say for one building, would
assist the assessment.

Information Required

     5. Provide an indicative architectural rendering indicating the external finishes and demonstrating the
        development’s integration into the site’s natural setting.


Response

Please refer to attached Finishes Palette Schedule Plan 7043/DA26 prepared by Blackburne Jackson Architects,
which show external finishes and colours and demonstrates the development’s integration into the site’s natural
setting.



3.0 WASTE MANAGEMENT

Issue – Waste Collection

A waste management plan for the development site is required.

Information Required

     6. Submit a Waste Management Plan in accordance with Noosa Planning Scheme Policy 11 – Waste
        Management Plans. The Plan must demonstrate how the proponent will comply with Noosa Planning
        Scheme Policy 9 – Waste Management. The plan must also address refuse truck accessibility to the
        site and to the refuse collection bays particularly to the refuse bay near Building C and the refuse
        collection for Building D.

Response

Please refer to attached letter dated 21 April 2016 and associated plans prepared by Morgan Consulting
Engineers which demonstrates that refuse trucks can manoeuvre to and through the site and can access all the
refuse collection bays in accordance with Noosa Planning Scheme Policies. Additional comments regarding the
refuse management strategy are provided below:


         Refuse storage areas are located in the basement of Buildings D-G, and opposite Building C to service
          Buildings A-C. The storage areas have been sized to accommodate bulk storage bins / recycling bins in
          accordance with the Noosa Council planning scheme policies 9 and 11.




JFP Ref: M2652                                                                                                Page 4
Log in to download the original file

FINAL Response to Information Request_ 03.05.2016.pdf · 741 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.