Q4 · 1 April to 30 June 2026 · plan 2025-26
On Track 11-20%
The new Changing Places Facility is under construction and temporary stabilistation of Gympie Terrace Revetment Wall has been completed with ultimate design works in line with the Masterplan now underway. Asset renewals continue in line with the Masterplan where possible. Additional walking and cycling counts to inform future pathway designs have been completed.
- Lead service, as extracted
- Infrastructure Services
- Reported start / end
- 07-25 / 10-26 (source month-year wording)
Source discrepancy: detailed rows and introductory summary differ. On Track: 52 detailed rows versus 53 in the summary. Minor Disruption: 17 detailed rows versus 16 in the summary. The progress chart counts detailed rows; inspect page 2 of the original summary before drawing conclusions.
98 unique initiative rows reconcile to the report’s declared 98 initiatives. Column text is extracted from the printed layout; consult the original page for wrapped wording. This does not establish a deadline breach or the cause of reported disruption.