This timeline uses NoosaWatch’s attributed transcript times on its own subtitled recording. It does not assign speech to agenda items. Drag across the timeline to choose a window, or use the start/end controls. Select a speech block to watch that actual segment. Chairing and procedural speech are included; airtime is not a measure of impact.
Timeline axis: hours:minutes on the local recording. Transcript version 176bbd8bc8e49029 · the chart and record list below use the same selected time window. Segment text is supplied in full for context, even when only part of its duration contributes.
Filter and investigate these records
Named speaking time by Person
Named speaking time
Speaking time for each named speaker in the selected meetings, with overlapping passages counted once. Topic and item filters select whole meetings; these times do not measure an individual item’s discussion. Select a bar to inspect its records. Seconds use the selected local window where set, and include speech unallocated to agenda items.
Declare the meeting open at 9:30. Firstly, I'd like to begin by an Acknowledgement to Country. I would like to respectfully acknowledge the Kabi Kabi people as the Traditional Custodians of the lands and waters that form the region we call
Simple so Councillors the purpose of this report is to seek Council's endorsement of the planning assumptions and growth projections derived from Unitywater's DMAT model and tracking it's a demand modeller and we call it DMAT to inform Unit
Not at this stage. They can straight to the constraints that they talk about. The land constraints. Can you just elaborate on that a bit? Because it just was a bit light on detail it seemed to me. What it really meant by constraints and exa
Examples the hazard and constraints on the land what we see as overlays in Noosa Plan. So the overlays represent the constraints on the land. So for instance things like biodiversity, riparian, bushfire, flooding, those kind of constraints