SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 DECEMBER 2017
4. Infrastructure Issues
A number of infrastructure issues and commitments are raised in the Draft Foreshore Plan. The
following table summarises them and provides a preliminary indication of cost implications:
Item Infrastructure Description Initial Cost Ongoing
Issue Estimate Costs?
1 New DTMR boat Council to work with DTMR to identify alternate Nil No
ramp and trailer locations to the west of the foreshore plan area
parking suitable for upgrades and/or new boating facilities,
2 New fenced dog Design and construct a new dog off-leash $50k-100k Yes
off-leash area in enclosure.
Chaplin Park
3 New roofed Design and construct new multi-use roofed shelter $200k Yes
structure near for ceremonies and gatherings available for
Chaplin Park booking.
foreshore
4 Multi-use water Significant master planning and infrastructure TBC Yes
sports precinct project to cater for needs of multiple sporting clubs (requires
at Noosa Yacht and redevelop the area adjacent the existing Yacht investigation)
& Rowing Club Club building.
5 Public toilets Investigate opportunity to provide additional public TBC TBC
toilets between existing toilets at Lions Park to the (requires
west and Ely Park 900m to the east. investigation)
6 Pathway Review public comments regarding standard of Nil No
standards pathways within the foreshore.
7 Traffic and Review public comments regarding traffic and Nil No
transport parking, including:
planning - Changing Gympie Terrace to a one-way street
- Reduce parking and create more green space
- Public transport
- Pathway links to Tewantin
It is proposed these infrastructure issues would be progressed with the appropriate sections of
Council for action, via Council resolution, when the final Foreshore Plan is adopted in 2018.
5. Next Steps
Following adoption of the Draft Noosaville Foreshore Land Use Master Plan, the final project
components proposed are:
Further community consultation on the Draft Foreshore Plan through Council’s Your Say
Noosa website, with public submissions open from 22 January 2018 to 22 February 2018.
Final Foreshore Plan to be reported to Council with details of responses to issues raised by
submissions.
Adoption of the Foreshore Plan via Council resolution.
The proposed further consultation period is scheduled to commence after the summer school
holidays to allow residents opportunity to be involved.
Page 10 of 79
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.