Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2017-12-12 Services & Organisation Committee Agenda

of 79

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                12 DECEMBER 2017


Department                                     Former     New FTE    Notes
                                                FTE
Infrastructure Planning, Design and Delivery       13.6       15.6      Increase of 1 FTE with the Project Officer position (LGOA6) becoming a
Branch                                                                   permanent full-time position (formally a 3 year temporary position).
                                                                        Increase of 1 FTE with the Designer – Capital Works position (LGOA5)
                                                                         becoming a permanent full-time position (formally a 3 year temporary
                                                                         position).
                                                                        An additional temporary position of Designer - Capital Works, 3 year fixed-
                                                                         term (LGOA5) (Note: Temporary positions are not counted in the FTE)
                                                                        An additional temporary position of Project Officer, 3 year fixed-term (LGOA5)
                                                                         (Note: Temporary positions are not counted in the FTE)
                                                                        Redesign and reclassification of the Technical Officer – Coastal and
                                                                         Foreshores position (LGOA5) to Project Coordinator – Flooding, Coastal and
                                                                         Foreshores (LGOA6).


TOTAL                                           359.47      364.87




                                                                                                                                        Page 47 of 79
Log in to download the original file

2017-12-12 Services & Organisation Committee Agenda(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.