Original source · versioned page text
2017-12-12 Services & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 DECEMBER 2017
Department Former New FTE Notes
FTE
Infrastructure Planning, Design and Delivery 13.6 15.6 Increase of 1 FTE with the Project Officer position (LGOA6) becoming a
Branch permanent full-time position (formally a 3 year temporary position).
Increase of 1 FTE with the Designer – Capital Works position (LGOA5)
becoming a permanent full-time position (formally a 3 year temporary
position).
An additional temporary position of Designer - Capital Works, 3 year fixed-
term (LGOA5) (Note: Temporary positions are not counted in the FTE)
An additional temporary position of Project Officer, 3 year fixed-term (LGOA5)
(Note: Temporary positions are not counted in the FTE)
Redesign and reclassification of the Technical Officer – Coastal and
Foreshores position (LGOA5) to Project Coordinator – Flooding, Coastal and
Foreshores (LGOA6).
TOTAL 359.47 364.87
Page 47 of 79
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.