Council archive · source document
09/1058 - Change a Development Approval [As Published] · 132009.1058.02
2009/1058 22. 23. 24, 25. 26. 27. 28, 29. ” Bricks 21.3. high speed data cables and television provider boxes are disconnected and removed to the standard required by the regulatory authority All building materials containing asbestos, including asbestos cement sheeting.or roofing and lagging, must be removed from the building and disposed of in accordance with industry best practice. Waste generated during construction must be stockpiled in a centralised location and covered as required to prevent material being blown onto adjoining properties including the road reserve or food waste from generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly or via an approved waste receptacle and collection service. Storage areas are to be located near the temporary access to the site so that access can be gained with out damage to infrastructure. All building materials containing asbestos products must be disposed on in accordance with indusiry best practice. A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the relocation site or between the sites must be repaired or reinstated to at least pre- existing conditions. All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed areas are revegetated using species identified in PSP3 — Landscaping Plants and Guidelines. The transportation of all materials to and from the site must be undertaken in a manner such that no particle matler escapes onto a public road. All vehicles carrying out materials either to or from the site shall be covered to prevent materials, including dust, being windblown from the vehicle. A Waste Management Plan (demolition) shall be submitted to the Planning Assessment section of the Sunshine Coast Regional Council ~ Tewantin office, prior to the issue of a- development permit for building works. The waste Management Plan (demolition) is required to be submitted in accordance with Planning Scheme Policy 11- Waste Management Plans. The Plan shall contain the following information:- ° A waste management table as indicated below is to be completed showing how waste material is to be segregated — recycled — reused or disposed. “MATERIALS ON-SITE DESTINATION | - Re-use and Recycling ‘Disposal Expected waste materials Estimated : On-site “specify : ‘Off-site “specify ° “Specify : volume (m3) | proposed reuse or ; contractor & : contractor & : : onsite recycling : recycling outlet : landfill site methods : : Excavation material © Green waste Concrete Timber — please specify “Plasterboard Page 4 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1058 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.