” Bricks

21.3. high speed data cables and television provider boxes are disconnected and
removed to the standard required by the regulatory authority

All building materials containing asbestos, including asbestos cement sheeting.or roofing
and lagging, must be removed from the building and disposed of in accordance with industry
best practice.

Waste generated during construction must be stockpiled in a centralised location and
covered as required to prevent material being blown onto adjoining properties including the
road reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service. Storage areas are to be located near the temporary access to the site so
that access can be gained with out damage to infrastructure.

All building materials containing asbestos products must be disposed on in accordance with
indusiry best practice.

A temporary crossing must be provided to protect road reserve infrastructure including kerb
and channel.

Any damage to footpaths, street plantings, kerb and channel or roadways at the removal
site, the relocation site or between the sites must be repaired or reinstated to at least pre-
existing conditions.

All disturbed areas must be revegetated or otherwise stabilised at the completion of the
works. Disturbed areas are revegetated using species identified in PSP3 — Landscaping
Plants and Guidelines.

The transportation of all materials to and from the site must be undertaken in a manner such
that no particle matler escapes onto a public road. All vehicles carrying out materials either

to or from the site shall be covered to prevent materials, including dust, being windblown

from the vehicle.
A Waste Management Plan (demolition) shall be submitted to the Planning Assessment

section of the Sunshine Coast Regional Council ~ Tewantin office, prior to the issue of a-

development permit for building works. The waste Management Plan (demolition) is required
to be submitted in accordance with Planning Scheme Policy 11- Waste Management Plans.
The Plan shall contain the following information:-

° A waste management table as indicated below is to be completed showing how
waste material is to be segregated — recycled — reused or disposed.

“MATERIALS ON-SITE DESTINATION | -
Re-use and Recycling ‘Disposal

Expected waste materials Estimated : On-site “specify : ‘Off-site “specify ° “Specify :

volume (m3) | proposed reuse or ; contractor & : contractor & :
: onsite recycling : recycling outlet : landfill site

methods : :

 

Excavation material ©

Green waste

 

Concrete

 

Timber — please specify

 

“Plasterboard

Page 4 of 17

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1058 - Change a Development Approval [As Published].pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.