Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment 8- Amended Engineering Report MCU12/0208

of 109

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 61, section 1. The text section number identifies this passage in the reader.

                                                                            Preliminary Erosion & Sediment Control Strategy
                                                                                                         Noosa on Weyba




4               Available Management Practices
The IECA guidelines outline numerous best practice drainage control, erosion control and sediment control
measures that are available to assist with minimising sediment transportation from construction sites.
Table 4-1, Table 4-2, Table 4-3 and Table 4-4 list some of the commonly used control measures considered
appropriate for use during the construction phase of the proposed development.

Table 4-1       Drainage Control Measures
Technique                         Typical Use
Catch Drain                       To collect and divert sheet flows across a slope or around disturbed / exposed
                                  areas.
Flow Diversion Bank / Bund        To divert flows when in-situ soils are dispersive or highly erodible.
Batter Chutes                     To convey concentrated flows down steep slopes.
Level Spreaders                   To convert minor concentrated flows back to sheet flows.

Table 4-2       Velocity Control Measures
Technique                         Typical Use
Rock Check Dams                   Generally used in drains at least 500mm deep, with longitudinal grades of up to
                                  10%. Recommended for locations where it is anticipated that rocks will be removed
                                  once suitable grass cover has been established.
Sandbag Check Dam                 Recommended for drains less than 500mm deep, with longitudinal grades of up to
                                  10%.
Chute and Channel Linings         Recommended for steep channels where more appropriate to line channel rather
                                  than trying to reduce flow velocity. Possible lining materials include grass or turf,
                                  rock, erosion control matting or geo-synthetic lining. Allowable flow velocities will
                                  dictate the type of lining material that is most appropriate.

Table 4-3       Erosion Control Measures
Technique                         Typical Use
Erosion Control Blankets          For the temporary control of raindrop impact erosion on earth embankments not
                                  exposed to concentrated flows.
Light Mulching                    For the control of raindrop impact erosion of exposed soils. Suitable for flat or
                                  mildly sloping surfaces. Requires appropriate anchoring when placed on steeper
                                  slopes. Can assist with seed germination on newly seeded soils. Types of light
                                  mulching include hydromulch, temporary seeding and brush mulch.
Heavy Mulching                    For the stabilisation of exposed soils that are expected to remain non-vegetated for
                                  medium to long periods. Can assist with weed suppression in non-vegetated areas.
                                  Types of heavy mulching include bark or woodchip mulch, compost blanket and
                                  rock mulch.
Revegetation                      For temporary or permanent stabilisation of exposed soils. Methods include turfing
                                  and temporary seeding.




27 September 2013                                      Cardno                                                             4

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.