Council archive · source document
Attachment 8- Amended Engineering Report MCU12/0208
Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 64, section 1. The text section number identifies this passage in the reader.
Preliminary Erosion & Sediment Control Strategy
Noosa on Weyba
Catchment Disturbed Rainfall Soil Slope Erosion Ground Soil Loss
ID Catchment Erosivity Erodibility Length/ Control Cover (C) (A) (t/ha/yr)
Area (ha) Factor (R) Factor (K) Gradient Practice
Factor (LS) Factor (P)
L 5.20 5746 0.044 0.91 1.3 1.0 299
Based on the results of the preliminary analysis above, the soil losses within the disturbed areas of the
subject site have been estimated to range from 56 to 299 tonnes/ha/year giving the site a Soil Loss Class
range of 1 (0 to 150 tonnes/ha/yr) to 3 (226 to 350 tonnes/ha/yr). This classifies the site as having a very low
to low-moderate erosion risk as outlined in Table 3.1 of the IECA ‘Best Practice Erosion and Sediment
Control (2008)’ guidelines.
5.2 Preliminary Sediment Basin Calculations
In conjunction with the above information, the calculations for the Type D sediment basin volumes have been
carried out and shown in Table 5-2 below.
Table 5-2 Sediment Basin Sizing Calculations
Catchment ID Volumetric Catchment 5 day Total Settling Zone Storage Zone Total Basin
3 3 1 3
Runoff Area of Basin Rainfall Volume (m ) Volume (m ) Volume (m )
Coefficient (ha) Depth (R)
(Cv) (85%ile, 5
day)
B1 0.60 2.23 54.10 724 86 810
B2 0.60 3.62 54.10 1175 139 1314
C 0.60 1.37 54.10 445 53 498
D 0.60 3.75 54.10 1217 113 1330
E 0.60 3.41 54.10 1107 102 1209
F 0.60 3.44 54.10 1117 49 1166
G1 0.60 2.13 54.10 691 38 729
G2 0.60 1.96 54.10 636 35 671
G3 0.60 2.18 54.10 708 31 739
G4 0.60 2.31 54.10 750 29 779
H1 0.60 2.09 54.10 678 46 724
H2 0.60 2.79 54.10 906 40 946
H3 0.60 1.41 54.10 458 10 468
I1 0.60 3.94 54.10 1279 118 1397
I2 0.60 4.14 54.10 1344 115 1459
I3 0.60 4.26 54.10 1383 83 1466
I4 0.60 3.90 54.10 1266 150 1416
I5 0.60 1.93 54.10 627 21 647
J 0.60 1.77 54.10 575 25 600
K 0.60 0.66 54.10 214 15 229
L 0.60 5.20 54.10 1688 200 1888
1) Storage zone volume based on a regeneration maintenance period of 2 months.
27 September 2013 Cardno 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.