Preliminary Erosion & Sediment Control Strategy
Noosa on Weyba
6 Erosion and Sediment Control Strategy
6.1 Objective / Target
To control soil erosion on the site and prevent sediment discharge to downstream local water courses or
road stormwater drainage systems during storm events for the construction phase of the project.
6.2 Compliance Criteria
Refer Section 3 of this Erosion and Sediment Control Strategy, and to the project acid sulphate soils
management plan.
6.3 Control Measures
6.3.1 Phase 1 Construction – Site Setup Works
The Phase 1 construction works generally involves activities such as installing appropriate stabilised site
access points, establishing site compound areas, and undertaking initial clearing works to allow for the
installation of erosion and sediment control measures and haul roads.
Recommended erosion and sediment control techniques to be implemented prior to and during this phase of
construction include, but may not limited to, the following measures.
Install appropriate construction entry / exit device(s) at the nominated stabilised access points for the
construction site. These devices are provided to remove any loose materials from vehicles prior to
departure from the site.
Any riparian buffer zones or other areas of vegetation which are to be protected should be fenced off to
clearly restrict vehicle access to these ‘no go’ areas.
Suitable sediment fencing should be appropriately installed along the downstream extent of all areas to
be disturbed during the clearing works and bulk earthworks including haul roads.
Where practical ‘clean water’ diversion drains or bunds should be installed to direct ‘clean’ up-slope
stormwater runoff around disturbed or unstable areas. Appropriate velocity controls may need to be
implemented to ensure that these ‘clean water’ diversion measures do not create further erosion or scour
issues.
Areas subject to earthworks or trenching should be stripped of topsoil.
Confirm appropriate locations for cleared material and topsoil stockpiles ensuring that the stockpiles are
positioned away from overland flow paths, poor drainage areas or other likely confluences where
concentrated flow may cause sediment transportation. Any stockpiles should also be located as far as
possible from dwellings and other buildings near the site. Stockpiles are to be located up-slope of an
appropriate sediment control device, such as sediment or filter fencing, with a diversion bund or catch
drain positioned up-slope to minimise overland flows into the stockpile areas.
Local consent authorities generally require that suitable erosion and sediment control measures must be
present and available for inspection prior to the pre-start meeting.
6.3.2 Phase 2 and 3 Construction – Bulk Earthworks and Civil Works
The Phase 2 construction works generally involves the clearing works and bulk earthworks necessary to
create the allotments and roads outlined on the nominated engineering drawings. The Phase 3 construction
works generally involves the civil works associated with the sealing of roadways, the installation of services
and permanent stormwater treatment devices, and the stabilisation of the allotments.
Recommended erosion and sediment control techniques to be implemented prior to and during this phases
of construction include, but may not limited to, the following measures.
27 September 2013 Cardno 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.