Attachment 8- Amended Engineering Report MCU12/0208

of 109

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 65, section 1. The text section number identifies this passage in the reader.

                                                                         Preliminary Erosion & Sediment Control Strategy
                                                                                                      Noosa on Weyba




6             Erosion and Sediment Control Strategy
6.1           Objective / Target
To control soil erosion on the site and prevent sediment discharge to downstream local water courses or
road stormwater drainage systems during storm events for the construction phase of the project.

6.2           Compliance Criteria
Refer Section 3 of this Erosion and Sediment Control Strategy, and to the project acid sulphate soils
management plan.

6.3           Control Measures
6.3.1         Phase 1 Construction – Site Setup Works
The Phase 1 construction works generally involves activities such as installing appropriate stabilised site
access points, establishing site compound areas, and undertaking initial clearing works to allow for the
installation of erosion and sediment control measures and haul roads.
Recommended erosion and sediment control techniques to be implemented prior to and during this phase of
construction include, but may not limited to, the following measures.
    Install appropriate construction entry / exit device(s) at the nominated stabilised access points for the
    construction site. These devices are provided to remove any loose materials from vehicles prior to
    departure from the site.
    Any riparian buffer zones or other areas of vegetation which are to be protected should be fenced off to
    clearly restrict vehicle access to these ‘no go’ areas.
    Suitable sediment fencing should be appropriately installed along the downstream extent of all areas to
    be disturbed during the clearing works and bulk earthworks including haul roads.
    Where practical ‘clean water’ diversion drains or bunds should be installed to direct ‘clean’ up-slope
    stormwater runoff around disturbed or unstable areas. Appropriate velocity controls may need to be
    implemented to ensure that these ‘clean water’ diversion measures do not create further erosion or scour
    issues.
    Areas subject to earthworks or trenching should be stripped of topsoil.
    Confirm appropriate locations for cleared material and topsoil stockpiles ensuring that the stockpiles are
    positioned away from overland flow paths, poor drainage areas or other likely confluences where
    concentrated flow may cause sediment transportation. Any stockpiles should also be located as far as
    possible from dwellings and other buildings near the site. Stockpiles are to be located up-slope of an
    appropriate sediment control device, such as sediment or filter fencing, with a diversion bund or catch
    drain positioned up-slope to minimise overland flows into the stockpile areas.
Local consent authorities generally require that suitable erosion and sediment control measures must be
present and available for inspection prior to the pre-start meeting.

6.3.2         Phase 2 and 3 Construction – Bulk Earthworks and Civil Works
The Phase 2 construction works generally involves the clearing works and bulk earthworks necessary to
create the allotments and roads outlined on the nominated engineering drawings. The Phase 3 construction
works generally involves the civil works associated with the sealing of roadways, the installation of services
and permanent stormwater treatment devices, and the stabilisation of the allotments.
Recommended erosion and sediment control techniques to be implemented prior to and during this phases
of construction include, but may not limited to, the following measures.




27 September 2013                                     Cardno                                                          8

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.