                                                                         Preliminary Acid Sulphate Soil Management Plan
                                                                                                         Noosa on Weyba




1             Introduction
This preliminary acid sulphate soils management plan has been prepared for a proposed mixed used master
planned community named Noosa on Weyba at Noosaville, for Northbrook Corporation Pty Ltd.
This management plan has been prepared with reference to State Planning Policy (SPP) 2/02 Planning and
Managing Development Involving Acid Sulphate Soils, Guidelines for Sampling and Analysis of Lowland Acid
Sulphate Soils (ASS) in Queensland 1998 (QASSIT Guidelines), and the Queensland Acid Sulphate Soil
Technical Manual: Soil Management Guidelines version 3.8 (Deparment of Natural Resources and Water).
Prior to the start of earthworks onsite a detailed Acid sulphate Soils Management Plan is to be submitted and
approved by Sunshine Coast Regional Council. This detailed plan will outline the

1.1           Purpose
The purpose of this document is to identify potential areas of concern in regards to acid sulphate soils across
the development area and provide possible proposed treatment processes for these areas to support the
preliminary development application.
This plan aims to provide a preliminary identification of the acid-producing potential of the soils in relation to
the proposed works, for the development of management strategies to protect sensitive receptors such as
groundwater and adjacent waterways. The aim of this plan is to minimise the impact of the project on the
physical and social environment.

1.2           Implementation
Following the finalisation of the development layout a detailed Acid Sulphate Soils Management Plan is to be
prepared and approved by Sunshine Coast Regional Council prior to the start of any Earthworks onsite.
Detailed policies, procedures and performance criteria for the management of ASS during earthworks will be
provided.
The Responsible Party (the Contractor) shall be responsible for the implementation of this management plan.
In the event that changes to this plan are required, following the appointment of a Contractor or due to site
constraints, the Consulting Engineer must endorse the changes and application for a variation shall be made
to the relevant authority and prior to implementation.

1.3           Background
State Planning Policy (SPP) 2/02 Planning and Managing Development Involving Acid Sulphate Soils
provides procedures and strategies for the management of acid sulphate soils during site works. SPP2/02
defines two outcomes for the management of ASS in Queensland. Outcome 1 is relevant to this
development, and is reproduced below.
      Outcome 1: When undertaking development to which this SPP applies, the release of acid and
      associated metal contaminants into the environment is avoided by

         Not disturbing acid sulphate soils when excavating or otherwise removing soil or sediment,
          extracting groundwater or filling land; and
         Treating and, if required, undertaking ongoing management of any disturbed acid sulphate soils
          and drainage.

The aim of this management plan is to undertake an preliminary identification of potential areas of concern
regarding acid sulphate soils on the site and provide a management plan to ensure the proposed works
comply with Outcome 1 of the SPP. It is noted that Outcome 2 relates to planning schemes and is not
relevant to development applications.




10 October 2013                                       Cardno                                                         5

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.