Preliminary Acid Sulphate Soil Management Plan
Noosa on Weyba
7.2 Responsible Party
The Contractor shall be the responsible party during construction works on site. Following the completion of
works, the landowner or legal tenant shall be the responsible party.
7.3 Policy
To minimise the impact of construction on sensitive receptors and to comply with the Environmental Planning
and Assessment Act 1979; and the intention of the QASSIT Guidelines for Sampling and Analysis of
Lowland Acid Sulphate Soils in Queensland and State Planning Policy 2/02 Planning and Managing
Development Involving Acid Sulphate Soils.
7.4 Performance Objectives
To avoid detrimental impact on the soil and water quality and habitat values of the region, as a result of the
discharge of acidic waters from the site during construction activity through the following aims:
to minimise the potential for the transport of acidic leachate;
to prevent the development of actual acid sulphate soils; and
to protect surface water and groundwater quality on the site.
7.5 Site Preparation
A detailed Acid Sulphate Soils Management Plan shall be implemented onsite prior to works commencing.
Components relevant to site preparation include:
the appointment of an onsite geotechnical practitioner;
the procurement and storage of neutralisation materials; and
the inclusion of the provisions of this plan in the site induction for key staff.
7.6 Staff Training - Site Induction
A site induction will be conducted for key staff involved in earthworks outlining the requirements for
earthworks and civil construction on site. Key personnel will be made aware of the following:
prohibited actions, such as uncontrolled discharge of groundwater and transport of untreated
materials between zones and off site;
testing, treatment and validation requirements for soil and water prior to reuse onsite;
methods for stockpiling including treatment to stockpile pad (where applicable) and erosion and
sediment control devices;
the requirements of the approved Erosion and Sediment Control Plan;
the role of treatment ponds, pads and storage areas;
passive monitoring requirements, looking for indicators such as mottling, vegetation dieback, rusty
soils; and
the requirements of this Acid Sulphate Soils Management Plan.
7.7 Storage of Lime on Site
A supply of agricultural lime (CaCO3) shall be maintained on site at all times for the treatment of acid
sulphate soils. The supply shall be stored in a covered and bunded area to prevent accidental releases.
Hydrated lime, if required, shall be stored in suitable vessels, in bunded and covered areas.
7.8 Site Drainage
The runoff from all exposed acid sulphate soil areas is to be directed to temporary storage ponds or bunded
areas and shall be tested prior to reuse or discharge.
Where practical any temporary or permanent surface water drainage shall be constructed using shallow,
wide swales to avoid intersecting the water table and exposing potential ASS.
7.9 Transportation
No untested or untreated materials shall be transported off site.
10 October 2013 Cardno 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.