                                                                           Preliminary Acid Sulphate Soil Management Plan
                                                                                                           Noosa on Weyba


7.2           Responsible Party
The Contractor shall be the responsible party during construction works on site. Following the completion of
works, the landowner or legal tenant shall be the responsible party.

7.3           Policy
To minimise the impact of construction on sensitive receptors and to comply with the Environmental Planning
and Assessment Act 1979; and the intention of the QASSIT Guidelines for Sampling and Analysis of
Lowland Acid Sulphate Soils in Queensland and State Planning Policy 2/02 Planning and Managing
Development Involving Acid Sulphate Soils.

7.4           Performance Objectives
To avoid detrimental impact on the soil and water quality and habitat values of the region, as a result of the
discharge of acidic waters from the site during construction activity through the following aims:
         to minimise the potential for the transport of acidic leachate;
         to prevent the development of actual acid sulphate soils; and
         to protect surface water and groundwater quality on the site.

7.5           Site Preparation
A detailed Acid Sulphate Soils Management Plan shall be implemented onsite prior to works commencing.
Components relevant to site preparation include:
         the appointment of an onsite geotechnical practitioner;
         the procurement and storage of neutralisation materials; and
         the inclusion of the provisions of this plan in the site induction for key staff.

7.6           Staff Training - Site Induction
A site induction will be conducted for key staff involved in earthworks outlining the requirements for
earthworks and civil construction on site. Key personnel will be made aware of the following:
         prohibited actions, such as uncontrolled discharge of groundwater and transport of untreated
          materials between zones and off site;
         testing, treatment and validation requirements for soil and water prior to reuse onsite;
         methods for stockpiling including treatment to stockpile pad (where applicable) and erosion and
          sediment control devices;
         the requirements of the approved Erosion and Sediment Control Plan;
         the role of treatment ponds, pads and storage areas;
         passive monitoring requirements, looking for indicators such as mottling, vegetation dieback, rusty
          soils; and
         the requirements of this Acid Sulphate Soils Management Plan.

7.7           Storage of Lime on Site
A supply of agricultural lime (CaCO3) shall be maintained on site at all times for the treatment of acid
sulphate soils. The supply shall be stored in a covered and bunded area to prevent accidental releases.
Hydrated lime, if required, shall be stored in suitable vessels, in bunded and covered areas.

7.8           Site Drainage
The runoff from all exposed acid sulphate soil areas is to be directed to temporary storage ponds or bunded
areas and shall be tested prior to reuse or discharge.
Where practical any temporary or permanent surface water drainage shall be constructed using shallow,
wide swales to avoid intersecting the water table and exposing potential ASS.

7.9           Transportation
No untested or untreated materials shall be transported off site.


10 October 2013                                        Cardno                                                         16

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.