                                                                                Preliminary Acid Sulphate Soil Management Plan
                                                                                                                Noosa on Weyba




7.12             Dewatering
In areas where dewatering is required, extracted waters shall be directed to a temporary holding pond. The
extracted waters will then be tested for the parameters outlined in Table 7-2 below. Should the water held in
the pond achieve the release criteria, it may be discharged, however if it doesn’t meet the release criteria,
the water is to be neutralised, and then retested to verify compliance.
No waters shall be discharged or reused onsite unless verification testing reveals water quality properties in
achievement of the release criteria outlined in Table 7-2 below.
As part of the detailed Acid Sulphate Plan Management Plan, monitoring of the groundwater will be detailed.
This will likely include groundwater bores to monitor the groundwater levels, and the water quality of the
groundwater during earthworks and for a period after dewatering excavation.
The Queensland Acid Sulphate Soil Technical Manual outlines several other measures which may be
considered when managing with ASS and groundwater including the following:
            Minimise the volumes of soil excavated and thus soils dewatered at any one time.
            Minimise the drainage of soils within the cone of depression, for example:
                 o   use sheet piling to minimise groundwater drawdown and to limit seepage into the dry hole,
                 o   use physical barriers to slow down or stop flow from preferred pathways;
            Minimise oxygen delivery to the soils in the cone of depression by using physical barriers to limit
             vertical and horizontal oxygen transport;
The cone of depression is the volume of soil around a dewatering point that becomes unsaturated during
dewatering.

Table 7-2        Release Criteria for Stored Waters (all site water including dewatering and sediment
                 basins)

    Indicator                                            Release Criteria
                                                                1
    pH                                                   6.5-8.5
                                                                         1
    Suspended Solids                                     < 50 mg/litre
    Dissolved Oxygen                                     > 6 mg/litre
                                                                            1
    Total Nitrogen                                       < 250 µg/litre
                                                                        1
    Total Phosphorus                                     < 30 µg/litre
                                                                        2
    Aluminum                                             < 60 µg/litre
                                                                        2
    Iron                                                 < 20 µg/litre
                                                                    1
    Turbidity                                            <25 NTU
1
 Sourced from Sunshine Coast Regional Council Manual for Erosion and Sediment Control Version 1.2 November 2008
2
  Release criteria derived by doubling the values outlined in the Australian and New Zealand Guidelines for Fresh and
Marine Water Quality 2000 (ANZECC Guidelines) and Tables 3.3.2, 3.3.4, 4.4.3 as outlined in the Queensland Water
Quality Guidelines 2006 (Table 6.1) to account for the difference between receiving water quality objectives and
discharge criteria. Should testing of the receiving waters reveal values outside the water quality objectives outlined in the
ANZECC Guidelines, the release criteria values are to be revised.




10 October 2013                                            Cardno                                                          18

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.