Preliminary Acid Sulphate Soil Management Plan
Noosa on Weyba
7.13 Filling
A fill quality assessment shall be undertaken to determine the properties of imported fill materials. Fill
materials above the texture based Action Criteria in Table 6-1 are not suitable for use as fill unless
adequately treated and verified in accordance with Table6-2.
Preliminary proposed fill depths indicated on Cardno Drawing number 510119/002 Sketch 4 (Appendix A)
shows that filling will be to a depth of no greater than approximately 2.5 metres. Filling on the site has the
potential to temporarily raise the water table, bringing existing ASS into contact with water. Investigations to
date indicate that ASS may be present 1.5 metres below the existing natural surface, and in this regard
impacts would be expected to be minimal, however further investigations will be conducted for the detailed
Acid Sulphate Soils Management Plan to accurately identify the location of ASS and further access the
potential impacts.
To manage any potential transport of acidic groundwater during consolidation of the underlying layers, wick
drains are to be installed within the fill area and any waters collected from these wick drains will be tested
and treated in accordance with the detailed Acid Sulphate Soils Management Plan and the advice of the
appointed geotechnical practitioner.
7.14 Stockpiling
All areas designated for the stockpiling of acidic materials, for treatment or storage must be provided with
adequate treatment measures to ensure stockpiles do not become a source of pollution. Specifications for
areas stockpiling materials include the following minimum requirements
An impermeable layer of compacted clay or other suitable alternative must be provided to a depth
of 0.3-0.5 metres. The clay layer shall be treated with a guard layer of Ag Lime at a rate of 5kg per
square metre;
Diversion drains and banks to divert runoff around the stockpile areas. All banks and drains must
be treated with a guard layer;
Sediment fences around the perimeter of the stockpile areas; and
maximum height of 2 metres on stockpiles.
Untreated acidic materials must not be stockpiled for more than 70 hours.
7.15 Monitoring
Monitoring shall be undertaken to ensure the aims of this Management Plan are achieved. The parameters
to be tested are provided in Table 7-3. Monitoring should be in accordance with the recommended time
schedules in Table 7-4.
10 October 2013 Cardno 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.