Preliminary Acid Sulphate Soil Management Plan
Noosa on Weyba
Table 7-3 Summary of Monitoring, Testing and Reporting
Monitoring Type Details
Site Monitoring The Contractor shall conduct regular site inspections for evidence of environmental harm
caused by acidic materials with particular reference to the following:
Scalding degradation of vegetation;
Presence of corroded shell;
Death or disease of aquatic organisms;
Formation of jarosite and other acidic materials;
Standing waters very clear or blue green indicating aluminium;
Invasion by acid dominated or acid tolerant species;
Rust coloured deposits on plants or the banks of drains;
Corrosion of concrete and/or steel structures in contact with soil or water;
Black to very dark water indicating de-oxygenation;
Sulphidic odours (rotten egg smell).
Weekly Site Inspection reports shall be prepared by the Contractor detailing the results of all
monitoring undertaken on site and provided to the Consultant Engineer.
Soil Testing The Contractor shall undertake the testing of excavated materials where potential or existing
ASS may have been disturbed, in accordance with the QASSIT Guidelines.
Discharge Testing Prior to discharge or reuse on site, the Contractor shall test stored waters to ensure compliance
with the discharge criteria outlined in Table 7-2. This requirement is for all temporary
waterbodies, including sediment basins and wick drains. All results must be included in the
weekly Contractor report.
Validation Testing The Contractor shall undertake testing of lime treated and placed fill material at a frequency of
at least one test per 500m3. Tests shall monitor fill for acid generating potential by SPOCAS or
approved equivalent such as the Chromium Reducible Sulphur Method. Laboratory
determination of Total Potential Acidity shall be conducted on at least 10% of the samples.
Groundwater The Contractor shall undertake groundwater quality monitoring around the perimeter of the fill
Monitoring pad area on a weekly basis during construction. Testing for the following parameters
pH;
Groundwater Depth;
Iron;
Aluminium; and
Cl/SO4 ratio.
Surface Water The Contractor shall undertake monitoring of any temporary surface waters on a weekly basis
Monitoring during construction. Testing for the following parameters:
pH;
Iron;
Aluminium;
Cl/SO4 ratio; and
Total Suspended Solids.
10 October 2013 Cardno 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.