Skip to the record
Beware of cheap imitations.

Council archive · source document

Minor Change Assessment · 132008.176.06

Attached to the e-mail Minor Change - Conditions with SARA, Updated Plans & Remove Bus Stop - 132008.176.06.

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

The DA Rules state:

In determining whether the proposed change would result in substantially different
development, the assessment manager or referral agency must consider the individual
circumstances of the development, in the context of the change proposed.

 Description / Provisions                  Comment / Response
 A change may be considered to result in a substantially different development if the
 proposed change:

 •   Involves a new use; or                  No new land use is proposed.

 •   Results in the application applying to No new land is included as part of the
     a new parcel of land; or               application.

 •   Dramatically changes the built form in The proposed changes do not
     terms of scale, bulk and appearance; dramatically change the built form in
     or                                     terms of scale, bulk and appearance.

 •   Changes the ability of the proposed No changes are made to the proposed
     development to operate as intended development to impede its operations.
     (for example, reducing the size of a
     retail complex may reduce the
     capacity of the complex to service the
     intended catchment); or

 •   Removes a component that is integral The proposed changes do not involve
     to the operation of the development; removal of a component that is integral
     or                                   to the operational of the development.

 •   Significantly impacts on traffic flow The proposed changes do not result in
     and the transport network, such as significant impacts on traffic flow and the
     increasing traffic to the site; or    transport network, such as increasing
                                           traffic to the site.

 •   Introduces new impacts or increases The proposed change does not
     the severity of known impacts; or   introduce any new impacts, nor will it
                                         increase the severity of known impacts.

 •   Removes an incentive or offset No incentive or offset components
     component that would have balanced incorporated.
     the   negative   impact   of   the
     development; or

 •   Impacts on infrastructure provisions.   The proposed development does not
                                             impact upon infrastructure provisions.

Used in these records

About this file

File size
794 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Assessment.pdf · 794 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.