Attachment 1B - Approval 2006-2237 - Stage 2B
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
2006/2237
19. Revised plans shall be submitted for Eco-cabins on Lots 36 & 43 prior to the issue of
Operational Works, demonstrating compliance with energy efficiency outcomes of the Code
(Overall Outcome 8). In this regard, revised plans shall demonstrate the provision of eaves,
overhangs and shade elements over the northern, eastern and western sides for Eco-cabins
on Lots 36 and 43.
20. Security in the form of a cash bond or trading bank guarantee to the sum of $50,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
21. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
22. The Development Permit for a material change of use of premises lapses if the use has not
happened by 19 April 2011, unless an application to extend the currency is approved by
Council.
23. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Vehicle Access
24. The applicant shall provide details of construction access arrangements to Stage Two that will
ensure minimal impacts to residents in Stage 1. A plan showing access arrangements shall be
submitted in conjunction with an Operational Works application and shall be included within
the Traffic Management Plan.
25. The applicant shall submit details of when Service Vehicle Access D will be constructed and
indicative alignment in conjunction with an Operational Works application.
26. Vegetation clearing required for the construction of internal roadways shall be in accordance
with the plan “Stage 2: Noosa North Shore – Beach Road Holiday Homes Tree Clearing Plan
Job No.50610” dated October 2006 and prepared by Terrain. The trees to be removed shall
be marked in accordance with the Site Works plan and a joint inspection shall occur prior to
Operational Works clearing commencing.
Stormwater Management
27. The applicant shall use permeable surfaces for low turnover parking areas, low use access
ways and shall investigate the possibility of reducing impermeable surfaces throughout Stage
1 in accordance with OO11b).
28. Detailed drawings shall be submitted with the Operational Works Application demonstrating
that the access ways, driveways and parking surfaces are designed to maintain existing
drainage patterns and avoid concentrating stormwater flows.
Pedestrian Access
29. The applicant shall submit an Integrated Movement Plan showing safe pedestrian and cycle
movements in accordance with the requirements of Queensland Streets and to demonstrate
compliance with OO14 of the Noosa North Shore Eco-Tourism Portal Development Code. It is
envisaged that this plan shall be incorporated into an amended Traffic Management Plan and
may involve an off-road pathway.
Sewer Infrastructure
30. The internal sewerage reticulation system, including pump stations shall be constructed to the
Standards and Requirements as detailed in the Plumbing and Drainage Act 2002.
Page 6 of 17
Print Date: 24 April 2015, 3:55 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1B - Approval 2006-2237 - Stage 2B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.